Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
2175 N 6TH AV
Address NEW:
2175 N 6TH AV
Apply Date:
01/17/2024
Applicant:
Kelly Rehm
Description:
The TUCSON SYMPHONY ORCHESTRA photovoltaic system will consist of 172 SILFAB 500W modules. Grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a new custom steel structure, at a 15° tilt.

Permit Reviews

Permit Number - TD-DEV-0124-00013
Permit Status: Complete
Permit Description: The TUCSON SYMPHONY ORCHESTRA photovoltaic system will consist of 172 SILFAB 500W modules. Grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a new custom steel structure, at a 15° tilt.
Start Date Submittal Complete Date Status  
03/15/2024 DEVELOPMENT PACKAGE NEW v.2 04/16/2024 APPROVED Review Details
01/17/2024 DEVELOPMENT PACKAGE NEW v.1 02/29/2024 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0124-00013
Permit Description: The TUCSON SYMPHONY ORCHESTRA photovoltaic system will consist of 172 SILFAB 500W modules. Grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a new custom steel structure, at a 15° tilt.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/27/2024 COT - ENGR - Signage Final Passed
06/27/2024 ENGR Engineering Final Passed
10/01/2024 SITE - Zoning Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TUCSON SYMPHONY ORCHESTRA PV 86.0KW - DEV PLAN_V2_V2.PDF DOCUMENTS VIEW
TUCSON SYMPHONY ORCHESTRA PV 86.0KW - DEV PLAN_V1.PDF PLANS UNDER REVIEW VIEW