Permit: TD-DEV-0124-00013
Permit Details
Apply Date:
01/17/2024
Applicant:
Kelly Rehm
Description:
The TUCSON SYMPHONY ORCHESTRA photovoltaic system will consist of 172 SILFAB 500W modules. Grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a new custom steel structure, at a 15° tilt.
Permit Reviews
Permit Number - TD-DEV-0124-00013
Permit Status: Complete
Permit Description: The TUCSON SYMPHONY ORCHESTRA photovoltaic system will consist of 172 SILFAB 500W modules. Grid-tied inverters will supply power through existing TEP service.
All modules will be mounted on a new custom steel structure, at a 15° tilt.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/15/2024 | DEVELOPMENT PACKAGE NEW v.2 | 04/16/2024 | APPROVED |
| 01/17/2024 | DEVELOPMENT PACKAGE NEW v.1 | 02/29/2024 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0124-00013
Permit Description: The TUCSON SYMPHONY ORCHESTRA photovoltaic system will consist of 172 SILFAB 500W modules. Grid-tied inverters will supply power through existing TEP service.
All modules will be mounted on a new custom steel structure, at a 15° tilt.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2024 | COT - ENGR - Signage Final | Passed | ||
| 06/27/2024 | ENGR Engineering Final | Passed | ||
| 10/01/2024 | SITE - Zoning Final | Passed |