Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.3
Permit Number - TD-DEV-0123-00115
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/01/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/26/2023 | Commercial Plumbing | REQUIRES RESUBMIT | |||
05/16/2023 | External Reviewers - Pima County Addressing | REQUIRES RESUBMIT | Good morning, Pima County Addressing is returning TD-DEV-0123-00115 The Place At Rita Ranch 1 for corrections. Please see the attached plan for comments. Nicholas Jordan Site Review Project Manager - Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
||
05/18/2023 | NPPO | REQUIRES RESUBMIT | See landscape comments | ||
06/01/2023 | ROW Engineering Review | REQUIRES RESUBMIT | TD-DEV-0123-00115 8411 S. Houghton Rd. Comments: 1. A PIA is going to be required for this project. https://www.tucsonaz.gov/tdot/private-improvement-agreement Contact TDOT Engineering for information. DOT-Engineering-Review-Section@tucsonaz.gov Or call. 520-791-5100 Jesus Villezcas 2. Please provide the PIA number for approval of the DP. Construction Requirements in the Right of Way: 1. New Concrete Curb per P.A.G. standard 209, is required along the entire property frontage of Jumping Cholla Dr. (Note: Maintain tangent-curb-alignment from the neighborhood at the east, on out towards Houghton Rd. This is for the “curb-alignment,” not tying into existing curb at the neighborhood to the east.) 2. Concrete Curb Terminal section per P.A.G. standard 212 will be required at the end of the curb at the end of the property frontage to the east, on Jumping Cholla. 3. Tie-in to the “Drain Grate” which runs across Jumping Cholla also with Concrete Curb Terminal section, per P.A.G. standard 212. 4. Positive and adequate street drainage will be required to be shown on the PIA plans for Jumping Cholla Dr. 5. New 5’ wide Concrete Sidewalk per P.A.G. standard 200 along the entire property frontage of Jumping Cholla. 6. 3’ minimum buffer between curb and sidewalk, unless ROW is limited. 7. Ingress/ Egress driveway entrance on Jumping Cholla to have 18’ radius curb returns. 8. Both Ingress/ Egress driveway entrances, tie-in to Houghton Rd, must have 25’ minimum curb returns. 9. Where the existing multi-use path ties into new curb returns, new Concrete Curb Access Ramps are required per P.A.G. standard 207. 10. Please provide an appropriate and adequate drainage facility for the two entrances crossing the drainageway along Houghton Rd. This design needs to be on the PIA plans. 11. At least one sidewalk is required to connect the onsite circulation path to sidewalk in the ROW on Jumping Cholla and also on Houghton Rd. 12. Where adjoining sidewalk from the property ties to sidewalk along the ROW frontage, a 60” X 60” ADA landing is required. Landings shall be 60” X 60” and not to exceed a 2% cross slope in all directions. (Tying in to the multi-use path also must meet the requirements of an ADA Landing.) 13. Protect in place existing streetlights. 14. Protect in place existing catch basins. 15. Protect in place or relocate accordingly, existing regulatory or warning signs. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
||
05/09/2023 | Site Engineering | REQUIRES RESUBMIT | Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview The Stormwater Detention-Retention Manual can be found online at https://www.tucsonaz.gov/files/pdsd/updated-retention-detention-manual/updated-retention-detention-manual.pdf TD-DEV-0123-00115 1. From recent clarification from Environmental Services per TSM section 8, although recycling service isn’t required the site needs to provide at minimum the enclosure space for both solid waste and recycling. A single enclosure won’t be sufficient and a double enclosure or additional single enclosures will be needed to meet this requirement. It is also important to point out per TSM section 8-01.4.I - required parking may be reduced for existing development when solid waste and recycling enclosures are provided. 2. Show a 14-foot by 40-foot clear space in front of each proposed dumpster to comply with waste access and maneuverability requirements in TSM 8-01.5.3 B. 3. Show locations of drainage spouts on each building. Ensure that roof drainage from every building is routed under or around sidewalks and does not flow over sidewalks. 4. Ensure any traffic comments regarding potential sidewalk along Houghton Rd are addressed 5. Provide a detail for the retaining wall along the portion Houghton Rd that is proposed in the Drainage Report. Show the proposed retaining wall on the site plan. 6. Underground water storage must be approved by PDSD. Contact Stephen Blood to receive approval for use of underground storage for this particular project and provide his approval letter with your next submittal. 7. Provide a draft of the required underground storage covenant. The covenant must be recorded before permit final approval. 8. An infiltration test for the proposed underground retention must be completed before permit issuance. 9. Provide specific maintenance procedures and schedules for the proposed underground water storage. 10. Provide approval from DTM for use of corrugated metal pipe culvert in ROW, generally culverts must be constructed of concrete. 11. Culvert should be designed following a process similar to Chapter 11 of the COT drainage manual to ensure backwater effects do not violate drainage/flooding requirements. Ensure this accounts for upstream discharge from the Jumping Cholla culvert and channel. Please contact DTM for more information. 12. Show proposed inlet and outlet inverts for the culvert on grading plan, and provide a detail showing construction standards and specifications for any headwalls, piping, etc. 13. Maximize water harvesting to landscaped areas by use of flush curbs, curb cuts, and scuppers. Utilize grading to direct water into landscaped areas. 14. Provide top and bottom elevations for water harvesting basins. Lianne Evans lianne.evans@tucsonaz.gov |
||
05/18/2023 | Site Landscape | REQUIRES RESUBMIT | TO: Review Coordinator FROM: Anne Warner, RLA PDSD Landscape/Native Plant Preservation Section PROJECT: The Place at Rita Ranch ACTIVITY NO: DP22-0105 v2 Address: 8299 S Houghton Rd Zoning: O-3 Existing Use: undisturbed Sonoran desert Proposed Use: multi-family TRANSMITTAL DATE: May18, 2023, 2023 DUE DATE: 9 days from above date COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed. This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting. 1. Please provide 7041 registrant information, as the name and number is not listed by the AZ Tech Board of Registration. 2. Sheet 21, 36 and are not required. 3. Sheet 37 - Placing trees along the edge of a parking area or at the ends of parking row does not meet the intent of the UDC. All spaces within 40’ of a tree is only one of the requirements, and it is required to meet all. The intent is to provide as much shade on the asphalt as possible, trees are expected to be placed within the parking area itself to mitigate the heat and glare radiated by the built environment, UDC 7.6.1.A.3. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.B.1.a., UDC Technical Standards Manual 5-01-.3.2 4. This comment was not sufficiently addressed - Please label the existing and future rights of way for all public streets, UDC 7.6.4.C.2.a. Label 30’ undisturbed Scenic Corridor on all landscape sheets. 5. The NPPO does not reflect the Scenic Corridor, nor are all the plants left undisturbed, please revise. 6. Landscape buffer calc table is incorrect, replace 10’ for 30’ for Scenic Overlay. 7. This comment was not sufficiently addressed - Please provide a summary of quantities of mitigation and TOS plants in a manner that makes it simple to cross check between landscape and NPP plans. Sort plants by species, then by low, medium, high. 8. This comment was not sufficiently addressed - Please include a detail for the backflow preventer and locking enclosure. 9. This comment was not sufficiently addressed - Provide a detail to show tree planting with root barrier adjacent to walkways, not just in ROW. 10. Engineer and LA - This comment was not sufficiently addressed - The grading/drainage and water harvesting plans do not meet the requirements of the water harvesting ordinance and technical standard. The plan doesn't show the effective use of run-off to supplement irrigation. The grading/drainage plans do not show curb openings, scuppers, catch basins (slope, top/bottom elevations). Move from “Materials Plan”. a. The catchment areas must provide water to the infiltration areas. Revise the grading to direct runoff to the landscape infiltration areas to the maximum extent possible. b. Catchment areas in the water harvesting table can only count the areas that are directed to the landscape infiltration areas. c. Clearly show the areas in each catchment area and the areas of effective landscape areas should be included within infiltration areas. d. Show rooftop drainage patterns and show how they are incorporated into the water harvesting calculations. e. Water harvesting areas should be depressed between 6 and 9 inches. These areas can be counted toward first flush retention requirements. The notes/plans indicate a .5’ depth, whereas the water budget table shows .75’. 11. This comment was not sufficiently addressed - Grading, hydrology, and landscape plans must be integrated to make maximum use of site storm water runoff for supplemental on-site irrigation purposes. The landscape, water harvesting, and grading plans must match.The Water Budget Table is incorrect, please check cell calculations.This comment was not sufficiently addressed - Provide a maintenance schedule for the landscape and irrigation for this project. UDC 2-10-4.2.A.4., please be specific.A site visit by this office is required to verify the low number of viable plants, prior to approval. 15. This comment was not adequately addressed - Please identify the project monitor, by name, address and phone number, prior to any grading activities, UDC 7.7.5. On-monitoring of all aspects of site clearing, grading, plant protection, preservation, salvage, and mitigation must be provided during project construction at the expense of the developer for all residential development that is over five acres and for all commercial and industrial development that is over one acre. The monitoring must be performed by an individual who is qualified in arid lands native plant resource identification and protection as specified in UDC Section 7.7.4.D, Professional Expertise. The monitor must provide periodic progress reports to the developer outlining the status of work accomplished and any problems encountered. A copy of these reports must be submitted to the PDSD for the project file. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package YOUR NEXT STEPS: Submit documents to the Tucson Development Center https://tdc-online.tucsonaz.gov/#/home 1) Comment Response Letter (your response to the reviewer's “Requires Changes” comments) 2) Plan Set (or individual sheets) 3) Naming Conventions 2nd resubmittal & subsequent reviews (3,4, etc.) should be labeled as: 2_Plan Set 2_Comment Response Narrative 2_Structural Calcs 3) Any other items requested by review staff If you have any questions, please contact me at anne.warner@tucsonaz.gov |
||
05/11/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: The Place at Rita Ranch 2 Development Package (1st Review) TD-DEV-0123-00115 TRANSMITTAL DATE: May 11, 2023 DUE DATE: May 26, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 25, 2024. 2-06.3.0 FORMAT REQUIREMENTS 1. COMMENT: 2-06.3.12 – The index of sheets shall include all drawings submitted for review to include the landscape, NPPO, etc. CONTENT REQUIREMENTS 2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-1222-00, adjacent to the title block on all sheets. 3. COMMENT: 2-06.4.4.C - Label the section corners on the location map. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 4. COMMENT: 2-06.4.7.A.4 - General Note 4 remove the reference to “(SUBJECT TO STANDARD 4.9.7.D.)” as it is not applicable to the proposed use, see UDC TABLE 4.8-3: PERMITTED USES - OFFICE ZONES. 5. COMMENT: 2-06.4.7.A.6 - Clearly demonstrate how the requirements of Article 5.3 are met; a. Show the 400’ Scenic Corridor Zone on the plan, see UDC Article 5.3.3.A. b. Until comment ## is addressed Zoning cannot verify if perimeter yard setback requirements are met. Per UDC Article 5.3.5.A 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 6. COMMENT: 2-06.4.9.A - As this site is made up of several parcels a lot combination is required. Provide a copy of the approved Pima County Combo Request form with your next submittal. 7. COMMENT: 2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. 8. COMMENT: 2-06.4.9.H.5 – Clearly demonstrate that the requirements of UDC Article 7.4.6.F.2.b are met from the “GUARDRAIL ON TOP OF WALL” to the PAAL shown in the northwest corner of the site. 9. COMMENT: 2-06.4.9.H.5 – As it appears that covered parking structures are proposed show the required 1’-0” setback form the structure to the PAALs, see UDC Article 7.4.6.F.2.a.(1). 10. COMMENT: 2-06.4.9.H.5.a - The vehicle parking space calculation shall include the number of van accessible spaces required and provided. 11. COMMENT: 2-06.4.9.H.5.a - Provide a detail for both a standard and accessible vehicle parking space. This detail shall include all applicable dimensions as required by UDC Figure 7.4.6-A and Table 7.4.6-1 and if applicable UDC Article 7.4.6.H.3. 12. COMMENT: 2-06.4.9.H.5.a - Provide a detail for the required accessible parking space sign. 13. COMMENT: 2-06.4.9.H.5.d – The bicycle parking space calculation is not correct. As the requirement is based on the number of bedrooms and the 1+ Bedroom is technically a 2 bedroom unit, the calculation should be based on 284 bedrooms. 14. COMMENT: 2-06.4.9.H.5.d – The provided bike rack detail does not addressed UDC Article 7.4.9.B.1.e. 15. COMMENT: 2-06.4.9.O - Provide perimeter yard setback dimensions on the plan from the buildings and covered parking shade structures to the north, south and west property lines. Unit the heights of the shade structures are provided Zoning cannot verify setback requirements. 16. COMMENT: 2-06.4.9.Q – Provide the square footage and the height of each structure within the footprint of the building(s). This includes the parking shade structures so that perimeter yard setbacks can be verified. 17. COMMENT: 2-06.4.9.Q – There appears to be some type of structure located in the northeast corner of the site. Clarify what this structure is and if applicable provide the square footage, height and use within the footprint of the building. 18. COMMENT: 2-06.4.9.R - Around the perimeter of the buildings it appears that parking vehicles will be allowed to overhang the 6’-0” sidewalk. Cleary demonstrate how parking vehicles will not reduce the sidewalk width to less than 4’-0”. Per UDC Article 7.4.6.H.3 vehicle overhangs are 2’-6” so the sidewalk is required to be 6’-6” wide unless wheel stops are provided. 19. COMMENT: 2-06.4.9.R – Until comment 17 is addressed requirements of TSM Section 7-01.3.3.B cannot be verified, additional comments maybe forth coming. 20. COMMENT: Provide a Residential Density Calculation the meets the requirements of UDC Article 6.4.7. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
06/01/2023 | Traffic Engineering Review | REQUIRES RESUBMIT | TD-DEV-0123-00115 8411 S. Houghton Rd. Comments: 1. A PIA is going to be required for this project. https://www.tucsonaz.gov/tdot/private-improvement-agreement Contact TDOT Engineering for information. DOT-Engineering-Review-Section@tucsonaz.gov Or call. 520-791-5100 Jesus Villezcas 2. Please provide the PIA number for approval of the DP. Construction Requirements in the Right of Way: 1. New Concrete Curb per P.A.G. standard 209, is required along the entire property frontage of Jumping Cholla Dr. (Note: Maintain tangent-curb-alignment from the neighborhood at the east, on out towards Houghton Rd. This is for the “curb-alignment,” not tying into existing curb at the neighborhood to the east.) 2. Concrete Curb Terminal section per P.A.G. standard 212 will be required at the end of the curb at the end of the property frontage to the east, on Jumping Cholla. 3. Tie-in to the “Drain Grate” which runs across Jumping Cholla also with Concrete Curb Terminal section, per P.A.G. standard 212. 4. Positive and adequate street drainage will be required to be shown on the PIA plans for Jumping Cholla Dr. 5. New 5’ wide Concrete Sidewalk per P.A.G. standard 200 along the entire property frontage of Jumping Cholla. 6. 3’ minimum buffer between curb and sidewalk, unless ROW is limited. 7. Ingress/ Egress driveway entrance on Jumping Cholla to have 18’ radius curb returns. 8. Both Ingress/ Egress driveway entrances, tie-in to Houghton Rd, must have 25’ minimum curb returns. 9. Where the existing multi-use path ties into new curb returns, new Concrete Curb Access Ramps are required per P.A.G. standard 207. 10. Please provide an appropriate and adequate drainage facility for the two entrances crossing the drainageway along Houghton Rd. This design needs to be on the PIA plans. 11. At least one sidewalk is required to connect the onsite circulation path to sidewalk in the ROW on Jumping Cholla and also on Houghton Rd. 12. Where adjoining sidewalk from the property ties to sidewalk along the ROW frontage, a 60” X 60” ADA landing is required. Landings shall be 60” X 60” and not to exceed a 2% cross slope in all directions. (Tying in to the multi-use path also must meet the requirements of an ADA Landing.) 13. Protect in place existing streetlights. 14. Protect in place existing catch basins. 15. Protect in place or relocate accordingly, existing regulatory or warning signs. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
||
04/27/2023 | CDRC Review Coordinator | REVIEW COMPLETED | |||
04/27/2023 | External Reviewers - COT Parks & Recreation | REVIEW COMPLETED | <tom.fisher@tucsonaz.gov> Hello CDRC team, On behalf of the City of Tucson Parks and Recreation Department, I have no comments on the above development plan. Tom Fisher Project Manager City of Tucson Parks and Recreation Department 900 S. Randolph Way Tucson, Arizona 85716 (520) 837-8037 |
||
04/27/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | Sent FYI email per SOP | ||
04/27/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | Sent FYI email per SOP | ||
04/27/2023 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | Sent FYI email per SOP | ||
04/27/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | Sent FYI email per SOP | ||
05/18/2023 | Fire New Construction | REVIEW COMPLETED | |||
04/26/2023 | OK to Submit - Engineering | REVIEW COMPLETED |