Permit Number: TD-DEV-0123-00105
Parcel: 127035430

Address:
5639 E 5TH ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.3

Permit Number - TD-DEV-0123-00105
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/10/2023 CDRC Post Review Express PENDING ASSIGNMENT
05/03/2023 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: 5639 E 5TH ST
Development Package (4th Review)
TD-DEV-0123-00105
TRANSMITTAL DATE: May 3, 2023



COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 1 , 2024.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)



Zoning acknowledges that a TSMR has been applied for. A Technical Standard Modification Request (TSMR) is required to modify the required pedestrian circulation to both Baker and 5th . If approved provide the TSMR record number adjacent to the title block on all sheets and provide a general note stating the case number, date of approval, what was modified and if applicable any conditions of approval. The TSMR must be approved prior to approval of this DP. The PDMR/TSMR can be submitted as a single submittal with a single fee.

This comment is still applicable please provide pedestrian circulation to both Baker and 5th.
2-06.4.9.S - Show existing or proposed pedestrian circulation along abutting rights-of-way. Such sidewalks must comply with accessibility requirements for the physically disabled and the design criteria in Section 10-01.0.0, Street Technical Standards, of the Technical Standards Manual.

20. COMMENT: 2-06.4.9.S - Provide the information noted by the standard above for both Baker and 5th.




***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations

If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
05/10/2023 TSMR/PDMR - Engineering REQUIRES RESUBMIT 1. Show the pedestrian path from the north parking lot running down the ease side of the property connecting to 5th St.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
05/10/2023 TSMR/PDMR - Zoning REQUIRES RESUBMIT Zoning acknowledges the hardship of connecting a pedestrian path to Baker St. However, a clear depiction of an ADA path running from the north parking lot to the proposed pedestrian connection to 5th St is required for zoning to approve the TSMR.
04/20/2023 CDRC Application Completeness Express REVIEW COMPLETED