Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-RES-0924-05114
Parcel: 112051720

Review Status: Requires Resubmit

Review Details: RESIDENTIAL SOLAR v.1

Permit Number - TC-RES-0924-05114
Review Name: RESIDENTIAL SOLAR v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/20/2024 Light Residential Building Review (OIP) APPROVED
10/04/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/04/2024 Site Engineering REQUIRES RESUBMIT This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home

Instructions:
Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record

Locations -> Confirm the location is accurate to the project. Click “Next”

Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”

Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”

More Info -> This will be filled in by the engineer assigned to your case, Click “Next”

Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”

7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”

Review and Submit -> Review all information to ensure accuracy. Click “Submit”

NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document.

Chris Arrington
chris.arrington@tucsonaz.gov
09/06/2024 PDSD Application Completeness Express REVIEW COMPLETED