Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2032 E MONTE VISTA DR
Apply Date:
09/05/2024
Applicant:
Noe Quijada
Description:
Roof-mounted PV solar installation, 11 modules, 4.29kW DC, 3.8kW AC. Addition to existing system. Total system 47 modules, 13.29kW DC, 11.4kW AC. With main panel upgrade.

Permit Reviews

Permit Number - TC-RES-0924-05114
Permit Status: Complete
Permit Description: Roof-mounted PV solar installation, 11 modules, 4.29kW DC, 3.8kW AC. Addition to existing system. Total system 47 modules, 13.29kW DC, 11.4kW AC. With main panel upgrade.
Start Date Submittal Complete Date Status  
09/06/2024 RESIDENTIAL SOLAR v.1 10/04/2024 REQUIRES RESUBMIT Review Details
10/15/2024 RESIDENTIAL SOLAR v.2 11/15/2024 APPROVED Review Details
12/11/2024 RESIDENTIAL SOLAR REVISION v.1 12/30/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0924-05114
Permite Description: Roof-mounted PV solar installation, 11 modules, 4.29kW DC, 3.8kW AC. Addition to existing system. Total system 47 modules, 13.29kW DC, 11.4kW AC. With main panel upgrade.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/29/2025 BULD - Electrical Clearance N/A Partial Pass Partial for the 200A service panel upgrade - INCR clearance to TEP was called at 12:00pm
Pending solar

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0924-05114
Permit Description: Roof-mounted PV solar installation, 11 modules, 4.29kW DC, 3.8kW AC. Addition to existing system. Total system 47 modules, 13.29kW DC, 11.4kW AC. With main panel upgrade.
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/27/2025 COT - RSOL - Electrical Final Solar Project Passed 2/27/25 pass
02/27/2025 RSBU - Building Final Passed 2/27/25 pass
03/17/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION RESPONSE LETTER LEVINE BYRNES 12.10.24_V1.PDF DOCUMENTS VIEW
CONS-MELISSA LEVINE - LISA BYRNES_V1_10-15-2024_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-MELISSA LEVINE - LISA BYRNES_V0_09-03-2024 (1)_V1_V2.PDF DOCUMENTS VIEW