Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-0523-04983
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/13/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/13/2023 | Residential Building | REQUIRES RESUBMIT | TC-RES-0523-04983 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL REQUIREMENTS: The City of Tucson adopted the 2018 IRC with amendments on 1/1/2019. Show the current code reference on the plans. GENERAL COMMENTS : 1. All plans submitted for a newly constructed one- or two-family dwelling requires compliance with design ordinances for handicap, solar water, photo-voltaic, gray water and EV charging preparations. Design Ordinances adopted by the City of Tucson. 2. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc. 3. All plans submitted for a newly constructed one- or two-family dwelling after March 1, 2009, require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½”control conduit and two ¾” copper piping for water with rooftop termination; straight 3” capped sleeve; or an accessible attic (clear path 30” wide x 30” high) over the water heater. Show appropriate notation. 4. All plans submitted for a newly constructed one- or two-family dwelling after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces. b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Update breaker space to the last panel space. 5. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. Use the appropriate detail at https://www.tucsonaz.gov/pdsd/water-energy-conservation 6. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space or show the distance from transit or a bike boulevard as not greater than a quarter-mile. PLANS: 1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include the threshold condition at the vehicle doorway or an exterior hinged door when the garage is used for the accessible route. ELECTRICAL PLANS: 1. TEP may require the service panel for the property at the closest building to the service transformer. A service line change or a new meter location must be coordinated with TEP for approval. 2. Protection of all interior 15A & 20A circuits serving outlet locations (except garage, kitchen, and bathrooms) including receptacles, lights and smoke detectors require combination type arc-fault circuit interrupters, E3902.16. Include circuit #20 & 22. 3. Provide the Electric Vehicle Supply Equipment 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready” and locate the receptacle at a parking area, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) like the HVAC entry, N1104.2.2. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. Please contact the plans reviewer if you have any questions: Ken Van Karsen (520) 837-4912 PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/pdsd |
||
| 05/18/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review PROJECT: TC-RES-0523-04983 1460 W. Delaware St. – R-2 2nd Dwelling Unit (1st Review) TRANSMITTAL DATE: March 18, 2023 Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the R-2 zone (UDC 4.7.9). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.6, .9, & .10. 1. COMMENT: It does not appear that the recorded land split, S22-04, documents have be submitted to PDSD. Until these documents have been provided to PDSD Zoning cannot approve this plan. 2. COMMENT: Provide the lot dimensions on the plot plan. 3. COMMENT: The 21’ street perimeter yard setback dimension line is not correct and it should be shown as a 20’ setback measured from the street property line, UDC 6.4.5.C.1.a. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 05/08/2023 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 05/15/2023 | Site Engineering | REVIEW COMPLETED | |||
| 05/15/2023 | Site Landscape | REVIEW COMPLETED |