Permit: TC-RES-0523-04983
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1460 W DELAWARE ST UNIT 2
Address NEW:
1460 W DELAWARE ST UNIT 2
Apply Date:
05/05/2023
Applicant:
George Zazueta
Description:
2nd Dwelling Unit
Permit Reviews
Permit Number - TC-RES-0523-04983
Permit Status: Inspections
Permit Description: 2nd Dwelling Unit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/09/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 06/17/2024 | RESTAMP - RESIDENTIAL v.1 | 06/20/2024 | APPROVED |
| 05/08/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/13/2023 | REQUIRES RESUBMIT |
| 09/26/2023 | RESIDENTIAL NEW DWELLING v.2 | 10/17/2023 | REQUIRES RESUBMIT |
| 08/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | N/A | REQUIRES RESUBMIT |
| 05/22/2024 | RESIDENTIAL NEW DWELLING v.4 | 06/14/2024 | APPROVED |
| 08/25/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 08/28/2026 | APPROVED |
| 11/03/2023 | RESIDENTIAL NEW DWELLING v.3 | 11/15/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0523-04983
Permit Status: Inspections
Permit Description: 2nd Dwelling Unit
| Date | Description | Comments |
|---|---|---|
| 06/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0523-04983
Permite Description: 2nd Dwelling Unit
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | 11/13/24 pass. Exterior sheathing and clip is to schedule. No truss schedule on site. |
| 01/27/2025 | RSBU - Building Final | N/A | Re-inspection required | 1-27-25, paint/coat all exterior plastic, install hammer arrestor on dishwasher, lower thermostat to a height of 54". |
| 01/27/2025 | COT - RSME - Mechanical Final | N/A | Not Ready | 1-27-25, unable to verify operation of hvac because unit has no power. |
| 01/27/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 1-27-25, paint/coat all exterior plastic, install hammer arrestor on dishwasher, lower thermostat to a height of 54". |
| 01/27/2025 | COT - RSEL - Electrical Final | N/A | Not Ready | 1-27-25, not ready. Unit currently has no power, however, I verified that all receptacles/smoke detectors are installed per approved plans. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0523-04983
Permit Description: 2nd Dwelling Unit
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2024 | COT - RSPL - Rough Soil | Passed | ||
| 09/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/19/2024 | COT - RSBU - Preslab | Passed | ||
| 09/20/2024 | COT - RSEL - Grounding/Bonding | Passed | Approved ufer ground to rebar, okay to pour | |
| 10/31/2024 | COT - RSBU - Roof Nailing | Passed | OK to dry-in roof system. | |
| 11/15/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | passed 11/15/24 | |
| 11/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and cover walls. | |
| 01/27/2025 | BULD - Electrical Clearance | Passed | 1-27-25, panel approved to be energized. ECO clearance sent to TEP. | |
| 01/27/2025 | COT - RSPL - Sewer | Passed | 1-27-25, approved. | |
| 01/27/2025 | COT - RSPL - Yard Water Line | Passed | 1-27-25, main water line approved. Okay to backfill trench. | |
| 02/06/2025 | RSBU - Building Final | Passed | 2/6/25 pass | |
| 02/06/2025 | COT - RSME - Mechanical Final | Passed | 2/6/25 pass | |
| 02/06/2025 | COT - RSPL - Plumbing Final | Passed | 2/6/25 pass | |
| 02/06/2025 | COT - RSEL - Electrical Final | Passed | 2/6/25 pass |