Permit Review Detail
Review Status: Requires Resubmit
Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Permit Number - TC-MDP-1223-01860
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/15/2023 | Residential Building | APPROVED | |||
| 01/08/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/20/2023 | ROW Engineering Review | REQUIRES RESUBMIT | Site Plan Add Arterial label to 36th St per Major Streets and Route Map Show adequate onsite turn around per TSM 10-01.6.1.E Proposed driveway exceeds 20' max for residential driveways, revise. Show existing survey monument and provide distance from Property line to Survey monument control line. West driveway edge needs to be 80' minimum from Tyndall Ave's paved edge per Access Management Future MS&R ROW is 100'; show future MS&R line (50' from survey monument control line). Please contact Jesus.villezcas@tucsonaz.gov if more information is needed |
||
| 01/08/2024 | Site Engineering | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Lianne Evans at lianne.evans@tucsonaz.gov or Stephen Blood at Stephen.Blood@tucsonaz.gov if you have any questions about the FUP. |
||
| 12/20/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-MDP-1223-01860 907 E 36TH ST Zoning C-2 SFR TRANSMITTAL DATE:December 20, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: Provide a Residential Plot Plan that meets the requirements found at: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/residential_plot_plan_requirements.pdf This shall in include: A. Property line distances, revise the property line distances as they are incorrect, https://www.asr.pima.gov/Parcel/Index https://onbase.pima.gov/publicaccess/DS_NextGen_Single/etc/cq/results.html?cqid=240&OBKey__552_1=02039 2.COMMENT: The minimum setback is the greater of ten (10) feet, or Three fourths (3/4) the height of the structure’s wall facing each interior property line (Table 6.3-2.A). Based on a wall height of 8’-6” the required perimeter yard setback from the proposed SFR to the east property line is 10’-0”, proposed setback is 7’-0”. A Design Development Option (DDO) must be submitted and approved to reduce the required setback, DDO application and requirements can be found at: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/planning-amp-zoning/2019_ddo_for_setback_and_height_udc.pdf . The completed application shall be submitted as a PDF under assigned permit number. If you have questions about the DDO application or process please contact Wyatt Berger at wyatt.berger@tucsonaz.gov or Georgia Pennington at georgia.pennington@tucsonaz.gov 3.COMMENT: As 36th st is designated on the COT MS&R map as an Arterial clearly demonstrate that vehicles will be able to turn around on site and not have to back out onto 36th st right-or-way if all vehicle parking spaces are occupied. All vehicle maneuvering must be on site. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
| 12/14/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 12/14/2023 | PDSD Application Completeness Express | REVIEW COMPLETED | Only main address listed. Needs addresses added for unit 1 and 2. Contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 |