Permit: TC-MDP-1223-01860
Permit Details
Apply Date:
12/01/2023
Applicant:
Jose Quintero
Description:
SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE PREVIOUSLY APPROVED MODEL T20-00004
Permit Reviews
Permit Number - TC-MDP-1223-01860
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/11/2024 | APPROVED |
| 12/14/2023 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/08/2024 | REQUIRES RESUBMIT |
| 02/07/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 02/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1223-01860
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004
| Date | Description | Comments |
|---|---|---|
| 03/11/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 03/11/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01860
Permite Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/30/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 07/30/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 07/30/2024 | RSBU - Building Progress | N/A | Not Ready | 7/30/24: not ready |
| 07/30/2024 | COT - RSPL - Plumbing Final | N/A | Not Ready | 7/30/24: not ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01860
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE
PREVIOUSLY APPROVED
MODEL T20-00004
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/02/2024 | COT - RSBU - Preslab | Passed | ||
| 04/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/19/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 04/29/2024 | BULD - Electrical Clearance | Passed | 4/29/24: ECO TEP CLEARANCE for 907 E 36TH ST UNIT 1 AND UNIT 2 | |
| 04/29/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4/29/24: seal all penetrations going through top plate, seal all penetrations going through vapor barrier, tub not installed and not under test at time of inspection, H2.5 clip missing at truss in three bedroom unit, properly secure exhaust fan flex sagging below truss, grounding at metallic boxes missing, 5/1/24: corrections made. |
|
| 06/20/2024 | COT - RSPL - Sewer | Passed | ||
| 06/21/2024 | COT - RSPL - Yard Water Line | Passed | Main domestic water line for,units 9-1 and,907. OK to cover progress areas. | |
| 07/30/2024 | COT - RSPL - Rough Soil | Passed | ||
| 07/31/2024 | ENGR Engineering Final | Passed | ||
| 09/16/2024 | RSBU - Building Final | Passed | 7/30/24: not ready 9/16/24: corrections made ok for CofO |
|
| 09/16/2024 | COT - RSEL - Electrical Final | Passed | 7/30/24: not ready 9/16/24: corrections made ok for CofO |
|
| 09/16/2024 | COT - RSEL - Outdoor Lighting | Passed | 7/30/24: not ready 9/16/24: corrections made ok for CofO |
|
| 09/13/2024 | COT - RSME - Mechanical Final | Passed | ||
| 09/16/2024 | RSBU - Building Progress | Passed | 7/30/24: not ready 9/16/24: corrections made ok for CofO |
|
| 09/16/2024 | COT - RSPL - Plumbing Final | Passed | 7/30/24: not ready 9/16/24: corrections made ok for CofO |