Permit Number: TC-MDP-1124-01281
Parcel: 138192400

Review Status: Requires Resubmit

Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1

Permit Number - TC-MDP-1124-01281
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/13/2024 Residential Building APPROVED
11/07/2024 Fire New Construction NOT REQUIRED
11/14/2024 ROW Engineering Review NOT REQUIRED Property Does not have connection to Right of way.. Property outside Right of Way..
12/03/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
11/21/2024 Site Engineering REQUIRES RESUBMIT TC-MDP-1124-01281
358 W ELVIRA RD

Site engineering comments are as follows:
1. Please refer to final plat of Elvira Subdivision, Bk 64 Pg 33. Show physical access to lot 4.
2. Access from alley to the east requires:
a. A re-plat of Lot 4 to abandon No Access Easements surrounding lot on the eastern and northern sides of the Lot
b. Department of Transportation and Mobility approval. Alley access would also require satisfaction of criteria stated in TSM 7.4.6.K

Ryan Insalaco
Email: ryan.insalaco@tucsonaz.gov
Phone: (520) 837-5351
12/03/2024 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: TC-MDP-1124-01281
358 W ELVIRA RD. – R-1
Duplex (1st Review)

TRANSMITTAL: December 3, 2024

This site is located in the R-1 zone (4.7.8). A duplex use is not a permitted use in the zones (UDC Table 4.8-2).

1. Per UDC Table 4.8-2 duplex use is not a permitted on a R-1 zoned parcel. At a minimum a Board of adjustment for Variance is required this may require a rezoning. Contact Mark Castro, phone (520) 837-4979 or email Mark.Castro@tucsonaz.gov to determine what process will be required.

2. Based on Elvira Subdivision plat found at: https://onbase.pima.gov/publicaccess/DS_NextGen_Single/etc/cq/results.html?cqid=240&OBKey__552_1=64033, there is a no access easement that runs around the north, east and west property lines.. Show this easements on the plot plan along with the recordation information.

3. Per the Elvira Subdivision plat General Note 9 Individual property owners will be required to submit native plant preservation plans for the approval and compliance with this subdivision’s approved native plant preservation plan.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
11/06/2024 PDSD Application Completeness Express REVIEW COMPLETED