Permit Number: TC-MDP-0723-01307
Parcel: 10513097A

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2

Permit Number - TC-MDP-0723-01307
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/04/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/04/2024 Other Inspection Reports (Deferred Submittal) Express REQUIRES RESUBMIT OUTDOOR LIGHTING CODE
We Thank You for submitting your memo regarding the following:
1. Epoxy Anchor: we accepted your statement and resulted the condition
2. Special Inspection Form: we accepted your statement and resulted the condition
3. Truss: Per memo from architect in charge David Garcia, there were no trusses used. However, TJI TrusJoist were used (unfortunately this falls in the category of trusses), see TJI submittal approved by Mr. Garcia, we used it to approve the truss condition.
4. OUTDOOR LIGHTING CODE: we consulted the model permit including the approved drawings. We found the statement to the effect that the project will follow the Outdoor Lighting Code. We could not find the other required information, perhaps that sheet is missing from the set. Should you have it, please submit it allowing us to use it to result the condition. The information should include the image(s) of the light fixtures used and their specification that includes the lumen and the kelvin temperature of the light source as well as the Outdoor Lighting Calculation for the project and if you happen to have it..the photometry of the site.
02/27/2024 PDSD Application Completeness Express REVIEW COMPLETED
03/04/2024 Post-Installed Anchor Inspection (Deferred Submittal) Express REVIEW COMPLETED Per memo from architect in charge David Garcia, there were no epoxy anchor used.
03/04/2024 Special Inspection Certificate Review (Deferred Submittal) Express REVIEW COMPLETED Per memo from architect in charge David Garcia, there were no epoxy anchor used therefore no special inspection form required.
03/04/2024 Truss Design (Deferred Submittal) Express REVIEW COMPLETED Per memo from architect in charge David Garcia, there were no trusses used. However, TJI TrusJoist were used (these falls in the category of trusses), see TJI submittal approved by Mr. Garcia.