Permit: TC-MDP-0723-01307
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
517 E CALLE ARIZONA BLDG 3
Address NEW:
517 E CALLE ARIZONA BLDG 3
Apply Date:
07/28/2023
Applicant:
David Garcia
Description:
BLDG-3 CALLE 4plex (Using Model T22-M0066)
Permit Reviews
Permit Number - TC-MDP-0723-01307
Permit Status: Complete
Permit Description: BLDG-3 CALLE 4plex (Using Model T22-M0066)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/04/2024 | REQUIRES RESUBMIT |
| 09/15/2023 | COMMERCIAL REVIEW - FULL v.4 | 09/21/2023 | REQUIRES RESUBMIT |
| 10/09/2023 | RESTAMP - COMMERCIAL v.1 | 10/11/2023 | APPROVED |
| 08/04/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/04/2023 | REQUIRES RESUBMIT |
| 02/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/12/2024 | REQUIRES RESUBMIT |
| 03/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 04/01/2024 | APPROVED |
| 08/09/2023 | COMMERCIAL REVIEW - FULL v.2 | 08/09/2023 | REQUIRES RESUBMIT |
| 07/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2024 | APPROVED |
| 08/11/2023 | COMMERCIAL REVIEW - FULL v.3 | 08/30/2023 | REQUIRES RESUBMIT |
| 03/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 03/15/2024 | REQUIRES RESUBMIT |
| 09/27/2023 | COMMERCIAL REVIEW - FULL v.5 | 10/09/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0723-01307
Permit Status: Complete
Permit Description: BLDG-3 CALLE 4plex (Using Model T22-M0066)
| Date | Description | Comments |
|---|---|---|
| 08/25/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 08/25/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 08/25/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 08/25/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/25/2023 | If used SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. If not used, have GC send an email confirming post installed epoxy anchors not used along with his name, his title, company that he works for, phone number. | |
| 04/03/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. Please hire a special lighting inspector to conduct the inspection and submit their field report. | |
| 08/25/2023 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. Please hire a special lighting inspector to conduct the inspection and submit their field report. | |
| 09/21/2023 | The zoning and building sections are satisfied and recognize a lot combination of the two parcels making up this project is currently in progress. Please review the project as if the lot combination has been completed and the project sits on a single lot. A revision to the Development Package reflecting the lot combination shall be forth coming. We will place a condition holding the final CofO for the building until completion of the lot combination. | |
| 08/25/2023 | Separate TFD permits are required for: Fire Sprinklers, Fire Alarm | |
| 07/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/25/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 08/25/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01307
Permite Description: BLDG-3 CALLE 4plex (Using Model T22-M0066)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2024 | COT - LCBU - Building Progress | N/A | Partial Pass | The overall development will require an accessible dwelling. PROPOSED NUMBER OF DWELLING IS 18. ONE ACCESSIBLE DWELLING "TYPE A" IS REQUIRED PER IBC 1107.6.2 AND TABLE 1107.6.1.1 (Indicate the building number and unit number where this accessible dwelling will be located.)**** NOTE to the inspector: Please confirm that the wheelchair-handicap accessible type A unit is built in the location as shown in the approved site plan. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01307
Permit Description: BLDG-3 CALLE 4plex (Using Model T22-M0066)
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2023 | COT - LCBU - Preslab | Passed | Ok to place concrete in progress areas. | |
| 11/08/2023 | BULD - Electrical Clearance | Passed | ||
| 11/08/2023 | COT - LCPL - Rough Soil | Passed | ||
| 11/14/2023 | COT - LCBU - Framing | Passed | ||
| 11/14/2023 | COT - LCBU - Roof Nailing | Passed | ||
| 12/15/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
| 12/15/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 12/15/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
| 02/06/2024 | COT - FCON - Alarm - Final | Passed | ||
| 02/08/2024 | ENGR Engineering Final | Passed | ||
| 02/06/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 02/06/2024 | COT - FCON - Fire - Final | Passed | ||
| 02/07/2024 | COT - LCBU - Building Final | Passed | ||
| 02/07/2024 | COT - LCEL - Electrical Final | Passed | ||
| 02/07/2024 | COT - LCME - Mechanical Final | Passed | ||
| 02/07/2024 | COT - LCPL - Plumbing Final | Passed |