Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1225-02340
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/23/2026 | Water - PDSD Standard | APPROVED | |||
| 01/26/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/26/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov 1. Please amend the construction documents to clearly identify the specific water-resistive barrier proposed for use, including product name and manufacturer. The WRB shall comply with the requirements of IBC Section 1403.2. 2. Please specify the Exterior Insulation and Finish System (EIFS) to be used, including the manufacturer and system designation. Provide the applicable ICC-ES evaluation report number and include a copy of the evaluation report within the construction documents, in accordance with IBC Section 1407.2. 3. Please provide an architectural special inspections certificate identifying special inspections for both the EIFS installation and the water-resistive barrier, as required by IBC Sections 1705.17 and 1705.17.1. 4. Sheet G0.1: Please reprint the COMcheck as it is difficult to read when enlarged. Additionally, please complete the signature line of the certificate. IBC 107.2.1 5. Sheet S2.0: The Shea Wall Schedule indicates SW1, SW2 and SW3 and the Structural Calcs indicate SW-1, SW-2, and do not list SW-3. However SW-A and SW-B are in the calcs but not on the construction drawings. A. Please coordinate the information between the construction drawings and the structural calculations so both documents provide the same information. B. Pleas provide a Shear Wall Key Plan in the structural calcs . C. If SW-3 is used, it would appear special inspection is required with the 3” spacing at the edge attachment, is this correct? Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 01/12/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1225-02340 (3500 S 12TH AV TUCSON, AZ 85713) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 3. Sheet E2.2 (comcheck is missing) is a duplicate of E2.1. Please provide the correct sheet. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 01/23/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1225-02340 ADDRESS/PARCEL: 3500 S 12TH AV TUCSON, AZ 85713 Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov COMMENTS: 1. Provide smoke detectors in the return air duct, upstream of any outside air connections, for all air distribution systems moving more than 2,000 CFM. Reference: Section 606.2.1, IMC 2018, as amended by the City of Tucson |
||
| 01/23/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1225-02340 ADDRESS/PARCEL: 3500 S 12TH AV TUCSON, AZ 85713 Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov COMMENTS: 1. The floor drain is not listed on the plumbing fixture schedule and on Sheet P1.0, the floor drain and the refrigerator are both labeled as P-5. Please correct. 2. A drinking fountain is called out in the plumbing fixture schedule (P-6) but not shown on the plans. Please identify where the drinking foundation will be on the plumbing plans. 3. Scuppers appear to be undersized. Section 1106.5 of the 2018 IPC states that parapet wall scuppers shall have a width that is equal to or greater than the circumference of the roof drain sized for the same roof area. 4. Please show the overflow scuppers on the Roof Plan and provide the scupper sizes. Reference section 1108, IPC 2018 a. The overflow scuppers appear to be overlapping the primary downspout on the elevation view (Sheet A5.1). The discharge point of the secondary roof drains shall be separate from the primary roof drains per Section 1108.2, IPC 2018. 5. Provide sizing information for the gutter. There doesn’t appear to be a detail showing the custom gutter on Sheet 9.1. Reference: Sections 1106.1 and 1106.6, IPC 2018. a. Please show the slope of the gutter in each direction, and dimensions of each gutter. Use Table 1106.6 for the gutter sizing. b. Please coordinate the Overall Roof Plan Keynotes on Sheet A4.0 with what is shown in the details on sheet A9.0 and A 9.1. |
||
| 01/12/2026 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Outdoor Lighting Review TC-COM-1225-02340 (3500 S 12TH AV TUCSON, AZ 85713) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). Outdoor Lighting Review: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf 1. Reference sheet ES1.0, Lumen Density table. Special Inspection IS required for all Recreational Facility lighting per OLC 106.2.2. Update note to indicate the correct code reference and that a Special Inspection IS required. 2. Provide An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 01/05/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-1225-02340 Location: 3500 S 12TH AV Review Date: 1/5/2025 Site Engineering Comments: 1. The proposed expansion to the site located at 3500 S 12TH AV which includes an enclosed tennis center falls under site work classification. Per UDC Article 3.3.3.G.2.c, a site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A Development Package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. 2. Site Engineering is unable to approve this building permit TC-COM-1225-02340 until the Development Package has been approved by all reviewers. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 01/22/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-COM-1225-02340 3500 S. 12th Ave. Tucson, AZ 85713 New Ground Up Tennis Center (1st Review) TRANSMITTAL DATE: 1/22/2026 This site is located in the R-2 zone (UDC 4.7.9). Educational Use is an allowed use in this zone (UDC Table 4.8-2) subject to Use Specific Standards 4.9.3.D.1-7. Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: Per UDC Article 3.3.3.G.2.c, a site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A Development Package (DP) meeting the minimum requirements is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/submittal_requirements.pdf. Site zoning is unable to approve this building permit until the DP has been approved by all reviewers. 2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 01/22/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 12/31/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |