| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/09/2026 | Site Engineering Standard | APPROVED | |||
| 04/23/2026 | Water - PDSD Standard | APPROVED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 04/21/2026 | Commercial Building Standard | REQUIRES RESUBMIT | April 21, 2026 2nd Review Bourn Companies Attn: Hass Dia 20 E. Congress Street, Suite 300 Tucson, Arizona 85701 Re: HOME2SUITES AT WILLIAM CENTER NEW BUILDING City of Tucson Permit Number: TC-COM-1225-02194 Stantec Project Number: 185215066 Stantec File Number: TUC-25-112 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-2 I-A 11,595 247 Yes Yes R-1 V-A 54,480 260 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, swimming pool, and signage. Deferred Submittals: Pre-engineered wood trusses, elevator shop drawings, handrails, guardrails, exterior cladding systems, roof mounted components, temporary shoring, engineered wood products, prefabricated wood shear and bearing wall panels, wood hold-down systems, and post-tension shop drawings. Special Inspections: Earthwork, concrete, post-tension, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, masonry, wood construction, spray fire-resistant materials, intumescent materials, and EFIS. GENERAL COMMENTS 1. Addressed. 2. Addressed. 3. Addressed. ARCHITECTURAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. Sheet A0.11 and A0.12 1. Addressed. 2. Addressed. SheetA1.10 1. Addressed. Sheet A4.00 1. Addressed. Sheet A4.01 1. Addressed. 2. Addressed. Sheet A4.10 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. Sheets A4.10 thru A4.92 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. 6. Addressed. 7. Addressed. 8. Addressed. Sheet A4.100 1. Addressed. 2. Addressed. Sheet A4.101 1. Addressed. 2. Addressed. Sheet A4.102 1. Addressed. 2. Addressed. Sheet A5.30 1. Addressed. Sheet A6.10 1. Addressed. Sheet A7.00 1. Addressed. Sheet A7.10 1. Addressed. 2. Previous Comment: Provide and show on the plans the required door maneuvering clearances at both sides of the doors at the stair enclosures per the requirements of ICC A117.1 Section 404.2.3 Still Required: The justification provided references 2024 IBC Section 1009.2.2; however, the submitted construction documents are being reviewed under the 2018 IBC, which does not contain this provision or equivalent language permitting the omission of door maneuvering clearances within stair enclosures under the conditions described. Per the currently adopted code, compliance with ICC A117.1 Section 404.2.3 is still required, and the required door maneuvering clearances must be clearly indicated on the plans at both sides of the stair enclosure doors. If you plan to utilize provisions from the 2024 IBC in lieu of the adopted 2018 IBC, a formal appeal/request for alternate materials and methods shall be submitted to the Building Official for review and approval. Approval of such an appeal must be obtained prior to acceptance of this design approach Sheet A7.12 1. Previous Comment: The plans indicate the use of combustible construction for the interior exit stairs. The bottom story of the proposed building is of Type I-A construction which only allows combustible materials in specification applications. Staircases are not one of the permitted applications. Please revise. [Ref. IBC 2018 Sec. 602] Still Required: The justification provided references 2021 IBC Section 510.2, Exception 4; however, the submitted construction documents are being reviewed under the 2018 IBC, which does not include this exception or equivalent provisions permitting combustible construction within interior exit stairways in Type I-A construction under the conditions described. Per the adopted code, 2018 IBC Section 602 requires Type I-A construction to be of noncombustible materials, and interior exit stairways are not identified as a permitted combustible application. If you intend to utilize provisions from the 2021 IBC in lieu of the adopted 2018 IBC, a formal appeal/request for alternate materials and methods shall be submitted to the Building Official for review and approval. Approval must be obtained prior to acceptance of this design approach. Sheet A7.20 1. Addressed. Sheet A7.73 1. Addressed. Sheet A8.00 1. Addressed. Sheet A8.50 1. New Comment: Detail D3 on this sheet must indicate a 3-hour fire resistance rated shaft and ceiling. Please also provide the listed assembly that will be used. [Ref. IBC 2018 Sec. 713.4] Sheet A10.00 1. New Comment: The drop-down ceiling indicated in the vestibule of Stair 2 includes mechanical ducts. Mechanical ducts are prohibited in interior exit stairs in accordance with Section 1023.5. Please provide a listed 3-hour rated horizontal assembly for the for the drop-down ceiling to separate the mechanical ducts from the interior exit stairway and maintain compliance with exception 4 of Section 510.2 of the 2021 IBC if an appeal is to be applied for. If not, then a 2-hour horizontal assembly would be required per. 1023.2. Sheet K101 1. Addressed. STRUCTURAL COMMENTS There are no comments. MECHANICAL COMMENTS General 1. Addressed. 2. Addressed. Sheet M0.2 1. Addressed. Sheet M2.00 1. Addressed. Sheet M4.00 1. Addressed. 2. Addressed. PLUMBING COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. Sheet P1.00 1. Addressed. Sheet P1.10 1. Addressed. 2. Addressed. ELECTRICAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. Sheet E0.01 1. Previous Comment: The Provide all information for the electrical equipment including voltage, amperage, short circuit current rating, overcurrent protection sizes, number of poles of all transfer switches, etc. Still Required: Provide a complete one-line and identify over-current protection device sizes as required by NEC 2017 Art. 215.3. Provide the short circuit current ratings of all equipment as required by NEC 2017 Art. 110.10. 2. Previous Comment: Provide the available fault current and fault current calculations to ensure compliance with NEC 110.9 & NEC 110.10. Still Required: This information is required for plan approval and a permit. 3. Previous Comment: Ensure compliance with NEC 250.58 for all grounding electrodes. Still Required: Comment not addressed. Sheets E0.02, E0.03, E0.04 and E0.05 1. Previous Comment: Provide all breaker AIC ratings, not the available fault current at the equipment, to ensure compliance with NEC 110.9 & NEC 240.86. Still Required: Comment not addressed. This information is required for plan approval and a permit. 2. Previous Comment: Provide a complete design and provide AFCI breakers or clarify exactly how compliance with NEC 210.12 will be provided. Still Required: The engineer shall provide a complete design for code compliant plan review. Clarify if the breakers are AFCI type and identify to ensure code compliance or identify all AFCI devices and clarify how code compliance will be met. 3. Addressed. Sheet E2.50 1. Addressed. Sheet E4.01A and E4.01B 1. Addressed. 2. Addressed. 3. Addressed. 4. Previous Comment: There is no power provided for the elevator pit sump pumps on the floor plan. Please clarify. Still Required: On sheet E4.01A please provide a panel and circuit identification for SP-1 and SP-2. Sheet E4.02A 1. Addressed. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Architectural, Mechanical, & Plumbing reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com Electrical Reviewed by: Russ Cox Senior Electrical Plan Reviewer 480-687-6049 Russel.cox@stantec.com Structural Reviewed by: Joel Svoboda, RA Senior Associate 520-545-7415 joel.svoboda@stantec.com |
||
| 04/21/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | April 21, 2026 2nd Review Bourn Companies Attn: Hass Dia 20 E. Congress Street, Suite 300 Tucson, Arizona 85701 Re: HOME2SUITES AT WILLIAM CENTER NEW BUILDING City of Tucson Permit Number: TC-COM-1225-02194 Stantec Project Number: 185215066 Stantec File Number: TUC-25-112 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-2 I-A 11,595 247 Yes Yes R-1 V-A 54,480 260 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, swimming pool, and signage. Deferred Submittals: Pre-engineered wood trusses, elevator shop drawings, handrails, guardrails, exterior cladding systems, roof mounted components, temporary shoring, engineered wood products, prefabricated wood shear and bearing wall panels, wood hold-down systems, and post-tension shop drawings. Special Inspections: Earthwork, concrete, post-tension, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, masonry, wood construction, spray fire-resistant materials, intumescent materials, and EFIS. GENERAL COMMENTS 1. Addressed. 2. Addressed. 3. Addressed. ARCHITECTURAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. Sheet A0.11 and A0.12 1. Addressed. 2. Addressed. SheetA1.10 1. Addressed. Sheet A4.00 1. Addressed. Sheet A4.01 1. Addressed. 2. Addressed. Sheet A4.10 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. Sheets A4.10 thru A4.92 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. 6. Addressed. 7. Addressed. 8. Addressed. Sheet A4.100 1. Addressed. 2. Addressed. Sheet A4.101 1. Addressed. 2. Addressed. Sheet A4.102 1. Addressed. 2. Addressed. Sheet A5.30 1. Addressed. Sheet A6.10 1. Addressed. Sheet A7.00 1. Addressed. Sheet A7.10 1. Addressed. 2. Previous Comment: Provide and show on the plans the required door maneuvering clearances at both sides of the doors at the stair enclosures per the requirements of ICC A117.1 Section 404.2.3 Still Required: The justification provided references 2024 IBC Section 1009.2.2; however, the submitted construction documents are being reviewed under the 2018 IBC, which does not contain this provision or equivalent language permitting the omission of door maneuvering clearances within stair enclosures under the conditions described. Per the currently adopted code, compliance with ICC A117.1 Section 404.2.3 is still required, and the required door maneuvering clearances must be clearly indicated on the plans at both sides of the stair enclosure doors. If you plan to utilize provisions from the 2024 IBC in lieu of the adopted 2018 IBC, a formal appeal/request for alternate materials and methods shall be submitted to the Building Official for review and approval. Approval of such an appeal must be obtained prior to acceptance of this design approach Sheet A7.12 1. Previous Comment: The plans indicate the use of combustible construction for the interior exit stairs. The bottom story of the proposed building is of Type I-A construction which only allows combustible materials in specification applications. Staircases are not one of the permitted applications. Please revise. [Ref. IBC 2018 Sec. 602] Still Required: The justification provided references 2021 IBC Section 510.2, Exception 4; however, the submitted construction documents are being reviewed under the 2018 IBC, which does not include this exception or equivalent provisions permitting combustible construction within interior exit stairways in Type I-A construction under the conditions described. Per the adopted code, 2018 IBC Section 602 requires Type I-A construction to be of noncombustible materials, and interior exit stairways are not identified as a permitted combustible application. If you intend to utilize provisions from the 2021 IBC in lieu of the adopted 2018 IBC, a formal appeal/request for alternate materials and methods shall be submitted to the Building Official for review and approval. Approval must be obtained prior to acceptance of this design approach. Sheet A7.20 1. Addressed. Sheet A7.73 1. Addressed. Sheet A8.00 1. Addressed. Sheet A8.50 1. New Comment: Detail D3 on this sheet must indicate a 3-hour fire resistance rated shaft and ceiling. Please also provide the listed assembly that will be used. [Ref. IBC 2018 Sec. 713.4] Sheet A10.00 1. New Comment: The drop-down ceiling indicated in the vestibule of Stair 2 includes mechanical ducts. Mechanical ducts are prohibited in interior exit stairs in accordance with Section 1023.5. Please provide a listed 3-hour rated horizontal assembly for the for the drop-down ceiling to separate the mechanical ducts from the interior exit stairway and maintain compliance with exception 4 of Section 510.2 of the 2021 IBC if an appeal is to be applied for. If not, then a 2-hour horizontal assembly would be required per. 1023.2. Sheet K101 1. Addressed. STRUCTURAL COMMENTS There are no comments. MECHANICAL COMMENTS General 1. Addressed. 2. Addressed. Sheet M0.2 1. Addressed. Sheet M2.00 1. Addressed. Sheet M4.00 1. Addressed. 2. Addressed. PLUMBING COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. Sheet P1.00 1. Addressed. Sheet P1.10 1. Addressed. 2. Addressed. ELECTRICAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. Sheet E0.01 1. Previous Comment: The Provide all information for the electrical equipment including voltage, amperage, short circuit current rating, overcurrent protection sizes, number of poles of all transfer switches, etc. Still Required: Provide a complete one-line and identify over-current protection device sizes as required by NEC 2017 Art. 215.3. Provide the short circuit current ratings of all equipment as required by NEC 2017 Art. 110.10. 2. Previous Comment: Provide the available fault current and fault current calculations to ensure compliance with NEC 110.9 & NEC 110.10. Still Required: This information is required for plan approval and a permit. 3. Previous Comment: Ensure compliance with NEC 250.58 for all grounding electrodes. Still Required: Comment not addressed. Sheets E0.02, E0.03, E0.04 and E0.05 1. Previous Comment: Provide all breaker AIC ratings, not the available fault current at the equipment, to ensure compliance with NEC 110.9 & NEC 240.86. Still Required: Comment not addressed. This information is required for plan approval and a permit. 2. Previous Comment: Provide a complete design and provide AFCI breakers or clarify exactly how compliance with NEC 210.12 will be provided. Still Required: The engineer shall provide a complete design for code compliant plan review. Clarify if the breakers are AFCI type and identify to ensure code compliance or identify all AFCI devices and clarify how code compliance will be met. 3. Addressed. Sheet E2.50 1. Addressed. Sheet E4.01A and E4.01B 1. Addressed. 2. Addressed. 3. Addressed. 4. Previous Comment: There is no power provided for the elevator pit sump pumps on the floor plan. Please clarify. Still Required: On sheet E4.01A please provide a panel and circuit identification for SP-1 and SP-2. Sheet E4.02A 1. Addressed. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Architectural, Mechanical, & Plumbing reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com Electrical Reviewed by: Russ Cox Senior Electrical Plan Reviewer 480-687-6049 Russel.cox@stantec.com Structural Reviewed by: Joel Svoboda, RA Senior Associate 520-545-7415 joel.svoboda@stantec.com |
||
| 04/21/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | April 21, 2026 2nd Review Bourn Companies Attn: Hass Dia 20 E. Congress Street, Suite 300 Tucson, Arizona 85701 Re: HOME2SUITES AT WILLIAM CENTER NEW BUILDING City of Tucson Permit Number: TC-COM-1225-02194 Stantec Project Number: 185215066 Stantec File Number: TUC-25-112 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-2 I-A 11,595 247 Yes Yes R-1 V-A 54,480 260 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, swimming pool, and signage. Deferred Submittals: Pre-engineered wood trusses, elevator shop drawings, handrails, guardrails, exterior cladding systems, roof mounted components, temporary shoring, engineered wood products, prefabricated wood shear and bearing wall panels, wood hold-down systems, and post-tension shop drawings. Special Inspections: Earthwork, concrete, post-tension, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, masonry, wood construction, spray fire-resistant materials, intumescent materials, and EFIS. GENERAL COMMENTS 1. Addressed. 2. Addressed. 3. Addressed. ARCHITECTURAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. Sheet A0.11 and A0.12 1. Addressed. 2. Addressed. SheetA1.10 1. Addressed. Sheet A4.00 1. Addressed. Sheet A4.01 1. Addressed. 2. Addressed. Sheet A4.10 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. Sheets A4.10 thru A4.92 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. 6. Addressed. 7. Addressed. 8. Addressed. Sheet A4.100 1. Addressed. 2. Addressed. Sheet A4.101 1. Addressed. 2. Addressed. Sheet A4.102 1. Addressed. 2. Addressed. Sheet A5.30 1. Addressed. Sheet A6.10 1. Addressed. Sheet A7.00 1. Addressed. Sheet A7.10 1. Addressed. 2. Previous Comment: Provide and show on the plans the required door maneuvering clearances at both sides of the doors at the stair enclosures per the requirements of ICC A117.1 Section 404.2.3 Still Required: The justification provided references 2024 IBC Section 1009.2.2; however, the submitted construction documents are being reviewed under the 2018 IBC, which does not contain this provision or equivalent language permitting the omission of door maneuvering clearances within stair enclosures under the conditions described. Per the currently adopted code, compliance with ICC A117.1 Section 404.2.3 is still required, and the required door maneuvering clearances must be clearly indicated on the plans at both sides of the stair enclosure doors. If you plan to utilize provisions from the 2024 IBC in lieu of the adopted 2018 IBC, a formal appeal/request for alternate materials and methods shall be submitted to the Building Official for review and approval. Approval of such an appeal must be obtained prior to acceptance of this design approach Sheet A7.12 1. Previous Comment: The plans indicate the use of combustible construction for the interior exit stairs. The bottom story of the proposed building is of Type I-A construction which only allows combustible materials in specification applications. Staircases are not one of the permitted applications. Please revise. [Ref. IBC 2018 Sec. 602] Still Required: The justification provided references 2021 IBC Section 510.2, Exception 4; however, the submitted construction documents are being reviewed under the 2018 IBC, which does not include this exception or equivalent provisions permitting combustible construction within interior exit stairways in Type I-A construction under the conditions described. Per the adopted code, 2018 IBC Section 602 requires Type I-A construction to be of noncombustible materials, and interior exit stairways are not identified as a permitted combustible application. If you intend to utilize provisions from the 2021 IBC in lieu of the adopted 2018 IBC, a formal appeal/request for alternate materials and methods shall be submitted to the Building Official for review and approval. Approval must be obtained prior to acceptance of this design approach. Sheet A7.20 1. Addressed. Sheet A7.73 1. Addressed. Sheet A8.00 1. Addressed. Sheet A8.50 1. New Comment: Detail D3 on this sheet must indicate a 3-hour fire resistance rated shaft and ceiling. Please also provide the listed assembly that will be used. [Ref. IBC 2018 Sec. 713.4] Sheet A10.00 1. New Comment: The drop-down ceiling indicated in the vestibule of Stair 2 includes mechanical ducts. Mechanical ducts are prohibited in interior exit stairs in accordance with Section 1023.5. Please provide a listed 3-hour rated horizontal assembly for the for the drop-down ceiling to separate the mechanical ducts from the interior exit stairway and maintain compliance with exception 4 of Section 510.2 of the 2021 IBC if an appeal is to be applied for. If not, then a 2-hour horizontal assembly would be required per. 1023.2. Sheet K101 1. Addressed. STRUCTURAL COMMENTS There are no comments. MECHANICAL COMMENTS General 1. Addressed. 2. Addressed. Sheet M0.2 1. Addressed. Sheet M2.00 1. Addressed. Sheet M4.00 1. Addressed. 2. Addressed. PLUMBING COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. Sheet P1.00 1. Addressed. Sheet P1.10 1. Addressed. 2. Addressed. ELECTRICAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. Sheet E0.01 1. Previous Comment: The Provide all information for the electrical equipment including voltage, amperage, short circuit current rating, overcurrent protection sizes, number of poles of all transfer switches, etc. Still Required: Provide a complete one-line and identify over-current protection device sizes as required by NEC 2017 Art. 215.3. Provide the short circuit current ratings of all equipment as required by NEC 2017 Art. 110.10. 2. Previous Comment: Provide the available fault current and fault current calculations to ensure compliance with NEC 110.9 & NEC 110.10. Still Required: This information is required for plan approval and a permit. 3. Previous Comment: Ensure compliance with NEC 250.58 for all grounding electrodes. Still Required: Comment not addressed. Sheets E0.02, E0.03, E0.04 and E0.05 1. Previous Comment: Provide all breaker AIC ratings, not the available fault current at the equipment, to ensure compliance with NEC 110.9 & NEC 240.86. Still Required: Comment not addressed. This information is required for plan approval and a permit. 2. Previous Comment: Provide a complete design and provide AFCI breakers or clarify exactly how compliance with NEC 210.12 will be provided. Still Required: The engineer shall provide a complete design for code compliant plan review. Clarify if the breakers are AFCI type and identify to ensure code compliance or identify all AFCI devices and clarify how code compliance will be met. 3. Addressed. Sheet E2.50 1. Addressed. Sheet E4.01A and E4.01B 1. Addressed. 2. Addressed. 3. Addressed. 4. Previous Comment: There is no power provided for the elevator pit sump pumps on the floor plan. Please clarify. Still Required: On sheet E4.01A please provide a panel and circuit identification for SP-1 and SP-2. Sheet E4.02A 1. Addressed. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Architectural, Mechanical, & Plumbing reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com Electrical Reviewed by: Russ Cox Senior Electrical Plan Reviewer 480-687-6049 Russel.cox@stantec.com Structural Reviewed by: Joel Svoboda, RA Senior Associate 520-545-7415 joel.svoboda@stantec.com |
||
| 04/21/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | April 21, 2026 2nd Review Bourn Companies Attn: Hass Dia 20 E. Congress Street, Suite 300 Tucson, Arizona 85701 Re: HOME2SUITES AT WILLIAM CENTER NEW BUILDING City of Tucson Permit Number: TC-COM-1225-02194 Stantec Project Number: 185215066 Stantec File Number: TUC-25-112 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms A-2 I-A 11,595 247 Yes Yes R-1 V-A 54,480 260 Yes Yes Separate Permits: Automatic fire sprinklers, fire alarm, swimming pool, and signage. Deferred Submittals: Pre-engineered wood trusses, elevator shop drawings, handrails, guardrails, exterior cladding systems, roof mounted components, temporary shoring, engineered wood products, prefabricated wood shear and bearing wall panels, wood hold-down systems, and post-tension shop drawings. Special Inspections: Earthwork, concrete, post-tension, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, masonry, wood construction, spray fire-resistant materials, intumescent materials, and EFIS. GENERAL COMMENTS 1. Addressed. 2. Addressed. 3. Addressed. ARCHITECTURAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. Sheet A0.11 and A0.12 1. Addressed. 2. Addressed. SheetA1.10 1. Addressed. Sheet A4.00 1. Addressed. Sheet A4.01 1. Addressed. 2. Addressed. Sheet A4.10 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. Sheets A4.10 thru A4.92 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. 6. Addressed. 7. Addressed. 8. Addressed. Sheet A4.100 1. Addressed. 2. Addressed. Sheet A4.101 1. Addressed. 2. Addressed. Sheet A4.102 1. Addressed. 2. Addressed. Sheet A5.30 1. Addressed. Sheet A6.10 1. Addressed. Sheet A7.00 1. Addressed. Sheet A7.10 1. Addressed. 2. Previous Comment: Provide and show on the plans the required door maneuvering clearances at both sides of the doors at the stair enclosures per the requirements of ICC A117.1 Section 404.2.3 Still Required: The justification provided references 2024 IBC Section 1009.2.2; however, the submitted construction documents are being reviewed under the 2018 IBC, which does not contain this provision or equivalent language permitting the omission of door maneuvering clearances within stair enclosures under the conditions described. Per the currently adopted code, compliance with ICC A117.1 Section 404.2.3 is still required, and the required door maneuvering clearances must be clearly indicated on the plans at both sides of the stair enclosure doors. If you plan to utilize provisions from the 2024 IBC in lieu of the adopted 2018 IBC, a formal appeal/request for alternate materials and methods shall be submitted to the Building Official for review and approval. Approval of such an appeal must be obtained prior to acceptance of this design approach Sheet A7.12 1. Previous Comment: The plans indicate the use of combustible construction for the interior exit stairs. The bottom story of the proposed building is of Type I-A construction which only allows combustible materials in specification applications. Staircases are not one of the permitted applications. Please revise. [Ref. IBC 2018 Sec. 602] Still Required: The justification provided references 2021 IBC Section 510.2, Exception 4; however, the submitted construction documents are being reviewed under the 2018 IBC, which does not include this exception or equivalent provisions permitting combustible construction within interior exit stairways in Type I-A construction under the conditions described. Per the adopted code, 2018 IBC Section 602 requires Type I-A construction to be of noncombustible materials, and interior exit stairways are not identified as a permitted combustible application. If you intend to utilize provisions from the 2021 IBC in lieu of the adopted 2018 IBC, a formal appeal/request for alternate materials and methods shall be submitted to the Building Official for review and approval. Approval must be obtained prior to acceptance of this design approach. Sheet A7.20 1. Addressed. Sheet A7.73 1. Addressed. Sheet A8.00 1. Addressed. Sheet A8.50 1. New Comment: Detail D3 on this sheet must indicate a 3-hour fire resistance rated shaft and ceiling. Please also provide the listed assembly that will be used. [Ref. IBC 2018 Sec. 713.4] Sheet A10.00 1. New Comment: The drop-down ceiling indicated in the vestibule of Stair 2 includes mechanical ducts. Mechanical ducts are prohibited in interior exit stairs in accordance with Section 1023.5. Please provide a listed 3-hour rated horizontal assembly for the for the drop-down ceiling to separate the mechanical ducts from the interior exit stairway and maintain compliance with exception 4 of Section 510.2 of the 2021 IBC if an appeal is to be applied for. If not, then a 2-hour horizontal assembly would be required per. 1023.2. Sheet K101 1. Addressed. STRUCTURAL COMMENTS There are no comments. MECHANICAL COMMENTS General 1. Addressed. 2. Addressed. Sheet M0.2 1. Addressed. Sheet M2.00 1. Addressed. Sheet M4.00 1. Addressed. 2. Addressed. PLUMBING COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. Sheet P1.00 1. Addressed. Sheet P1.10 1. Addressed. 2. Addressed. ELECTRICAL COMMENTS General 1. Addressed. 2. Addressed. 3. Addressed. Sheet E0.01 1. Previous Comment: The Provide all information for the electrical equipment including voltage, amperage, short circuit current rating, overcurrent protection sizes, number of poles of all transfer switches, etc. Still Required: Provide a complete one-line and identify over-current protection device sizes as required by NEC 2017 Art. 215.3. Provide the short circuit current ratings of all equipment as required by NEC 2017 Art. 110.10. 2. Previous Comment: Provide the available fault current and fault current calculations to ensure compliance with NEC 110.9 & NEC 110.10. Still Required: This information is required for plan approval and a permit. 3. Previous Comment: Ensure compliance with NEC 250.58 for all grounding electrodes. Still Required: Comment not addressed. Sheets E0.02, E0.03, E0.04 and E0.05 1. Previous Comment: Provide all breaker AIC ratings, not the available fault current at the equipment, to ensure compliance with NEC 110.9 & NEC 240.86. Still Required: Comment not addressed. This information is required for plan approval and a permit. 2. Previous Comment: Provide a complete design and provide AFCI breakers or clarify exactly how compliance with NEC 210.12 will be provided. Still Required: The engineer shall provide a complete design for code compliant plan review. Clarify if the breakers are AFCI type and identify to ensure code compliance or identify all AFCI devices and clarify how code compliance will be met. 3. Addressed. Sheet E2.50 1. Addressed. Sheet E4.01A and E4.01B 1. Addressed. 2. Addressed. 3. Addressed. 4. Previous Comment: There is no power provided for the elevator pit sump pumps on the floor plan. Please clarify. Still Required: On sheet E4.01A please provide a panel and circuit identification for SP-1 and SP-2. Sheet E4.02A 1. Addressed. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Architectural, Mechanical, & Plumbing reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com Electrical Reviewed by: Russ Cox Senior Electrical Plan Reviewer 480-687-6049 Russel.cox@stantec.com Structural Reviewed by: Joel Svoboda, RA Senior Associate 520-545-7415 joel.svoboda@stantec.com |
||
| 04/14/2026 | Outdoor Lighting Standard | REQUIRES RESUBMIT | 2nd Outdoor Lighting Review TC-COM-1225-02194 (349 S WILLIAMS BL TUCSON, AZ 85711) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). Outdoor Lighting Review: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf >>> The following comments were not addressed: 1) Provide an outdoor site lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your lighting fixture table and use the same number on your site plan. This will require all exterior lights to be shown on the site exterior lighting plan, including site and parking lot lights. 2) List the Lighting Area per OLC (typically E3) chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1. 3) Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation. 4) Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4. 5) Show lamps with a maximum of 3500K color temperature, OLC 402.1. 6) Provide the manufacturer’s specification sheets for the outdoor lighting fixtures. Include the lumen and color temperature values for each outdoor fixture type. 7) Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf 8) Specify any exceptions used. 9) Provide Curfew lighting controls If applicable Per section 403. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 04/09/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |