Permit Details

Status:
Approved - Awaiting Customer Attention
Type:
Commercial Building
Address NEW:
349 S WILLIAMS BL
Apply Date:
12/05/2025
Applicant:
Lisa Bowers
Description:
New 5-story hotel building

Permit Reviews

Permit Number - TC-COM-1225-02194
Permit Status: Approved - awaiting customer attention
Permit Description: New 5-story hotel building
Start Date Submittal Complete Date Status  
06/04/2026 COMMERCIAL REVIEW - FULL v.4 06/17/2026 REQUIRES RESUBMIT Review Details
04/08/2026 COMMERCIAL REVIEW - FULL v.3 05/01/2026 REQUIRES RESUBMIT Review Details
08/07/2026 RESTAMP - COMMERCIAL v.1 08/10/2026 APPROVED Review Details
06/23/2026 COMMERCIAL REVIEW - FULL v.5 07/08/2026 REQUIRES RESUBMIT Review Details
02/23/2026 COMMERCIAL REVIEW - FULL v.2 02/23/2026 REQUIRES RESUBMIT Review Details
08/10/2026 ADMINISTRATIVE v.1 08/10/2026 REQUIRES RESUBMIT Review Details
07/28/2026 COMMERCIAL REVIEW - FULL v.6 08/07/2026 APPROVED Review Details
12/10/2025 COMMERCIAL REVIEW - FULL v.1 01/23/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1225-02194
Permit Status: Approved - awaiting customer attention
Permit Description: New 5-story hotel building
Total Outstanding Activity Conditions - 19
Date Name
08/04/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.
08/04/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/04/2026 Prior to Final - Deferred Submittals- Elevator Designs must be submitted and approved prior to ...
08/04/2026 Prior to Final - Required Documents - ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
08/04/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/04/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
08/04/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
08/04/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
08/04/2026 Prior to Final - Required Documents - Masonry Inspection Report submittal review is required.
08/04/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/04/2026 Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required.
08/04/2026 Prior to Final - Deferred Submittals - Designs must be submitted and approved prior to installation of post tension design.
08/04/2026 Prior to Final - Required Documents - Post-Tension Inspection Report is required.
08/04/2026 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/04/2026 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
08/04/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/04/2026 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.
12/10/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/10/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Documents

File Name Document Type  
CONS-4_PLAN SET-349-WILLIAMS-BL_V4.PDF DOCUMENTS VIEW
4_COMMENT RESPONSE-2026-07-22_V4.PDF DOCUMENTS VIEW
STANTEC PSA_V1.PDF DOCUMENTS VIEW