Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1225-02181
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/26/2025 | Commercial Building Standard | APPROVED | |||
| 12/18/2025 | Commercial Electrical Standard | APPROVED | |||
| 12/30/2025 | Site Zoning Standard | APPROVED | |||
| 12/11/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 12/19/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 12/31/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/29/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Show that the walk-in cooler meets the construction requirements of Section C403.10.2, IECC 2018. 2. Show that the walk-in cooler meets the efficiency requirements of Section C403.10.2.1, IECC 2018. |
||
| 12/29/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Delete the extraneous gravity grease interceptor sizing table on P4. 2. Access to a required toilet facility shall not require customers to pass through a kitchen. Reference: Section 2902.3.1, IBC 2018. |
||
| 12/29/2025 | Water - PDSD Standard | REQUIRES RESUBMIT | Tucson Water limits a 5/8” meter to a maximum demand of 20 GPM. Provide a letter from Tucson Water confirming that the use of a 5/8” water meter serving a demand of 23GPM will be allowed for this project. | ||
| 12/31/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 12/09/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |