Permit: TC-COM-1225-02181
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
2932 E BROADWAY BL
Address NEW:
2932 E BROADWAY BL
Apply Date:
12/04/2025
Applicant:
Alan Katz
Description:
Interior Remodel - TI
Permit Reviews
Permit Number - TC-COM-1225-02181
Permit Status: Inspections complete
Permit Description: Interior Remodel - TI
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/24/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/27/2026 | APPROVED |
| 01/07/2026 | COMMERCIAL REVIEW - FULL v.2 | 01/08/2026 | REQUIRES RESUBMIT |
| 11/13/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/17/2026 | APPROVED |
| 12/09/2025 | COMMERCIAL REVIEW - FULL v.1 | 12/31/2025 | REQUIRES RESUBMIT |
| 01/15/2026 | COMMERCIAL REVIEW - FULL v.3 | 02/06/2026 | APPROVED |
| 02/06/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/06/2026 | APPROVED |
Conditions
Permit Number - TC-COM-1225-02181
Permit Status: Inspections complete
Permit Description: Interior Remodel - TI
| Date | Description | Comments |
|---|---|---|
| 12/29/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 12/09/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/26/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 02/03/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 12/09/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/29/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1225-02181
Permite Description: Interior Remodel - TI
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 11/18/2026 | COT - LCBU - Building Final | N/A | Re-inspection required | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 11/18/2026 | COT - LCEL - Electrical Final | N/A | Re-inspection required | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 11/18/2026 | COT - LCME - Mechanical Final | N/A | Re-inspection required | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 11/18/2026 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-1225-02181
Permit Description: Interior Remodel - TI
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2026 | COT - LCBU - Preslab | Passed | All saw cuts good for pour back. 5/28/2026 | |
| 06/26/2026 | COT - HCPL - Gas Pressure Test | Passed | ||
| 06/26/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 06/26/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 06/26/2026 | COT - HCPL - Rough Soil | Passed | ||
| 09/04/2026 | COT - LCBU - Framing | Passed | ||
| 10/19/2026 | COT - BULD - SWG Clearance | Passed | SWG SWG |
|
| 10/23/2026 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 10/26/2026 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 10/26/2026 | COT - LCME - Mechanical Intermediate | Passed | ||
| 11/18/2026 | COT - FCON - Fire - Final | Passed | ||
| 11/18/2026 | TRSP - ROW - Notice of Completion | Passed | No RoW Impact. | |
| 11/20/2026 | COT - LCBU - Building Final | Passed | 11/20/26: Building Final Approved. Note: I uploaded a digital copy of Health Department approval onto IG Inspect. |
|
| 11/20/2026 | COT - LCEL - Electrical Final | Passed | 11/20/26: Electrical Final Approved. Note: I uploaded a digital copy of Health Department approval onto IG Inspect. |
|
| 11/20/2026 | COT - LCME - Mechanical Final | Passed | 11/20/26: Mechanical Final Approved. Note: I uploaded a digital copy of Health Department approval onto IG Inspect. |
|
| 11/20/2026 | COT - LCPL - Plumbing Final | Passed | 11/20/26: plumbing Final Approved. Note: I uploaded a digital copy of Health Department approval onto IG Inspect. |