Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1223-02902
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/29/2023 | Site Zoning | APPROVED | |||
01/23/2024 | Site Engineering | NOT REQUIRED | |||
01/23/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/26/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 12/25/2023 6:58:37 AM 1. Sheet S2.0 – Detail 105 shows exterior footing at “GARAGE” opening. Where is this garage? Cross reference in partial foundation plan 1/S2.0. Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 12/25/2023 7:00:13 AM 1. Sheet T0.01 – Provide descriptive scope of work relevant to this construction permit. 2. Sheet T0.01 – Provide/select applicable City of Tucson building codes: City of Tucson IBC Local Amendments • Amendments to the 2018 International Building Code • Amendments to the 2018 International Existing Building Code • Amendments to the 2018 International Energy Conservation Code • Amendments to the 2018 International Fuel Gas Code • Amendments to the 2018 International Mechanical Code • Amendments to the 2018 International Plumbing Code • Amendments to the 2018 International Residential Code • Amendments to the 2018 International Swimming Pool & Spa Code • Amendments to the 2017 National Electrical Code • Amendments to the 2018 International Fire Code • City of Tucson/Pima County Outdoor Lighting Code • Arizona Administrative Code Title 18 Chapter 5 for public and semi-public swimming pools • ICC A117.1 - 2009 Accessible and Usable Buildings and Facilities (by reference) Adopting Local Amendments to the Building Code is authorized by Ordinance #11590. 3. Sheet T0.01 - Provide building code analysis of this facility per 2018 International Building Code: Provide area (SF), occupancy classification (Factory?), construction type, total occupancy load, any sprinkler and/or fire alarm systems, and required plumbing fixture calculations. Show the rest room location distance for these occupants when applicable. 4. Sheet T0.01 – List any relevant separate permits and/or deferred submittals. 5. Sheet AD1.01 – Label all existing rooms and show all doors and windows if any. No windows nor doors shown and no labeling of space functions. Only note of overhead door specified. 6. Provide life safety/egress plan showing compliance with 2018 International Building Code chapter 10. Show exit doors, travel distance of egress, total occupancy load, label all rooms showing functions, and any future or racks? 7. Sheet A1.01 – Provide new exterior elevation on North side that indicates new opening. Overhead door? Clarify the scope of this construction. Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 12/25/2023 6:59:10 AM 1. Sheet M2.02 RTP shows “Gas Electric” AC units but missing gas plan and gas calculations that including individual and total developed pipe lengths, pipe sizes, and loads. 2. How are the roof top units accessed? See 2018 International Mechanical Code section 306.5. Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 12/25/2023 6:59:33 AM 1. Sheet E1.01 – Any new underground electrical work if so, provide that underground cable detail. Keynote 1 mentions extending conduits and conductors. Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 12/25/2023 6:58:54 AM 1. Provide plumbing fixture calculations per 2018 International Plumbing Code section 403. Show the rest room location distance for these occupants when applicable. |
||
01/10/2024 | Fire New Construction | REVIEW COMPLETED | |||
12/22/2023 | PDSD Application Completeness | REVIEW COMPLETED | |||
01/22/2024 | Water - PDSD | REVIEW COMPLETED |