Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1222-00345
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/24/2023 | Site Engineering | NOT REQUIRED | |||
| 02/10/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/10/2023 | Commercial Building | REQUIRES RESUBMIT | 1) Submitted plan set identified as 90% Plan set. Provide 100% complete construction set for review. 2) Provide written response to review comments. |
||
| 01/23/2023 | Commercial Electrical | REQUIRES RESUBMIT | 1. It appears that there are 3 separate PV arrays on one rooftop (Industrial Building) with each array inverter ac output interconnecting to 3 different ac services (Industrial Building) (Office Building) (Laser Building). For clarity, provide a complete line diagram showing all 3 arrays (Office) (Laser) (Industrial), complete from PV modules to the Utility Interconnections in one diagram. The 3 separate array diagrams may still be included. Include all equipment and indicate the locations of each piece of equipment. 2. Plan sheets A-01 and A-02 show the Array sections numbered 01 through 06. Correlate this with the strings shown on the Line Diagrams. 3. The DG Disconnect must meet the requirements of NEC 690.13(C) ‘Suitable for use as Service Equipment’. Please verify. 4. Identify the Rapid Shutdown Initiation Devices and Warning Lables at or on the Industrial building for all 3 arrays, and also at the Office and Laser Buildings for their associated arrays. NEC 690.12(C), 690.56. Provide Permanent Plaques as required per NEC 705.10. 5. Provide a complete Grounding Detail showing the PV System Grounding and Bonding for the Racking, at each Building. Include the connections to each Grounding Electrode System at each Building. NEC 690.47. 6. 3 separate Buildings requires 3 Applications/permits, 1 for each building. It is permissible to provide all buildings and construction documents on one plan set, however each building or structure included in the scope of work must be clearly identified in each plan sheet. Including the Electrical Line Diagrams. Please submit accordingly for the subsequent re-submittals. Due to the nature of the information required to clarify in detail the proposed scope of work, additional comments may be generated from the subsequent electrical review. Ref 2018 IBC section 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. |
||
| 12/29/2022 | Fire New Construction | REQUIRES RESUBMIT | Provide perimeter pathways in accordance with IFC 1204.3. Questions: patricia.shelton@tucsonaz.gov/520.837.7082 |
||
| 01/11/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-COM-1222-00345 2465 N HUACHUCA DR Zoning I-1 TRANSMITTAL DATE:January 11, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: It appears that the south west portion of the building was built without permits, provide permit documentation for south west portion of the building If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
| 12/28/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |