Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 2465 N HUACHUCA DR
Search
Parcel Attributes
| Parcel | 10703146A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 3 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2465 N HUACHUCA DR
Date - 12/19/2025 9:55 a.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 2465 N HUACHUCA DR
Date - 12/19/2025 9:55 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000013798 | CLOSED | 09/13/2022 | N/A | Historical Information |
Permits
Address: 2465 N HUACHUCA DR
Date - 12/19/2025 9:55 a.m.
Total Number Of Permits - (24)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1222-00345 | Withdrawn | 12/21/2022 | 06/19/2023 | BLDG 3 | Commercial Building | PV Solar Install 299.7kW |
| TC-COM-1222-00256 | Void | 12/08/2022 | N/A | Commercial Building | Void-VF-Please submit under Category-Commercial Solar Permit PV solar install | |
| TC-COM-0423-01040 | Void | 04/12/2023 | 10/09/2023 | BLDG 2 | Commercial Building | Void - Wrong category type. Apply to permit category type Commercial Solar Permit. FOR SOLAR PROJECT PERMIT , ( OFFICE BLDG. 2, Tep meter # 157598654 |
| TC-COM-0423-01044 | Inspections Complete | 04/12/2023 | 02/04/2025 | BLDG 1 | Commercial Building | 170/100 76.5 KW - Roof Mount- Solar PV system for the INDUSTRIAL BUILDING/Building #1 per permit description. ( Address Bldg. #1) I had to withdraw the previous permit # TCM-COM-122200345, due design changes and wrong address. It was easier to start over, with new app. than to try and correct old info. This app and Bldg. is one of three separate Solar applications for 3 separate meters and bldgs. on the same property. |
| TC-COM-0423-01045 | Inspections Complete | 04/12/2023 | 02/04/2025 | BLDG 2 | Commercial Building | This is a 115.20 KW - Roof Mount - PV Solar System. For OFFICE Bldg. Meter, Bilding #2. (Address Bldg. # 2). I had to withdraw the previous application # TC-COM-0423-01040. Because i had it in the wrong category as Commercial Trade, instead of Commercial Solar. |
| TC-COM-0423-01046 | Complete | 04/12/2023 | 05/13/2025 | BLDG 4 | Commercial Building | 213.3 KW -Roof Mount Solar PV System, for LASER BUILDING - ( Address Bldg. #4.) 198 panels mounted on Laser Bldg #4 roof itself & 276 panels mounted on Office Bldg #2 roof To resolve any confusion as to the placement of all panels on all Buildings Keep in mind that the Panels for the 115.20 KW Office meter, itself , will be mounted on the Industrial Bldg. #1 . ( All shown on the Master Plans submitted for Ea. of the 3 separate projects. |
| TC-COM-0423-00940 | Issued | 04/01/2023 | 05/03/2024 | BLDG 1 | Commercial Building | Replace Main 480v 3ph 800A CT Cabinet due to Cabinet door Damage like for like , as per TEP requirement. (Emergency Repair) Bldg 1clearance |
| TC-COM-0223-00663 | Complete | 02/17/2023 | 06/26/2024 | BLDG 3 | Commercial Building | Continuance of permit T99Cm03203 for finals only permit $30000.00 - (INSPECTIONS for Fire - Lane Signs, Fire - Final, Landscape - Final, Building - Final) |
| P98AN00880 | ISSUED | 04/16/1998 | N/A | ADDRNEW | ||
| P99AN01881 | ISSUED | 07/06/1999 | N/A | 01 | ADDRNEW | |
| T00ME01133 | FINAL | 10/16/2000 | 01/23/2001 | MECH | PRESSURE VESSEL INSPECTION: TUC-23338, 23336, 23339, 23335, 24220 | |
| T12CM00708 | FINAL | 02/28/2012 | 09/12/2012 | 04 | COMBO | NEW GAS LINE - COMM |
| T16CM08211 | EXPIRED | 10/28/2016 | 07/31/2017 | COMBO | MEZZANINE IN EXISTING BLDG | |
| T98CM01664 | EXPIRED | 04/16/1998 | 04/05/1999 | COMBO | ADDITION:SHOP | |
| T99BU01292 | FINAL | 05/13/1999 | 08/11/2007 | GRADING | GRADING:50 CY CUT & 50 CY FILL | |
| T99CM02298 | EXPIRED | 05/13/1999 | 02/12/2001 | 02 | COMBO | METAL BLDG:NEW STORAGE |
| T99CM03203 | EXPIRED | 07/06/1999 | 10/16/2000 | 03 | COMBO | METAL BLDG #3 |
| T99CM03204 | EXPIRED | 07/06/1999 | 11/07/2000 | 04 | COMBO | METAL BLDG #4 |
| T99CM04982 | C OF O | 10/22/1999 | N/A | 02 | COMBO | TI:FACTORY |
| T99CM04983 | C OF O | 10/22/1999 | N/A | 04 | COMBO | TI:FACTORY |
| TUC-23335 | CERTIFIC | 06/17/1997 | 07/27/2003 | VESSEL | ||
| TUC-23336 | CERTIFIC | 12/01/1997 | 07/27/2003 | VESSEL | ||
| TUC-23339 | CERTIFIC | 08/15/2000 | 07/27/2003 | VESSEL | ||
| TUC-24220 | CERTIFIC | 07/01/1997 | 07/27/2003 | VESSEL |
Record Requests
Address: 2465 N HUACHUCA DR
Date - 12/19/2025 9:55 a.m.
Total Number Of Requests - (12)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0324-02395 | Complete | 03/25/2024 | 05/08/2024 | Requests | We need an extension due to minor complications that required equipment changes for Inverter's and Rapid Shutdown system, which caused some supply chain delays , and partial weather, delays. would like an additional 6 months just in case. |
| REQ-0324-02396 | Complete | 03/25/2024 | 05/08/2024 | Requests | We need an extension due to minor complications that required equipment changes for Inverters and Rapid shutdown System, which caused some supply chain delays, and partial weather delays. Would like to request additional 6 months just in case. |
| REQ-0324-02397 | Complete | 03/25/2024 | 05/08/2024 | Requests | We need an extension due to minor complications that required equipment changes, for Inverters and Rapid shut down system, which caused some supply chain delays, and partial weather delays. Would like to request additional 6 months just in case |
| REQ-0423-02109 | Complete | 04/12/2023 | 06/09/2023 | Requests | PV Solar Install 299.7kW |
| REQ-0423-02110 | Complete | 04/12/2023 | 08/12/2023 | Requests | BUILDING PERMIT REQUEST- FOR SOLAR PROJECT PERMIT , ( OFFICE BLDG. 2, Tep meter # 157598654 |
| REQ-0423-02113 | Complete | 04/12/2023 | 08/12/2023 | Requests | BUILDING PERMIT REQUEST- Am requesting withdraw because it is shown as Void- and in correct. and not a valid Application anymore. |
| REQ-0524-03468 | Canceled | 05/08/2024 | N/A | Requests | 170/100 76.5 KW - Roof Mount- Solar PV system for the INDUSTRIAL BUILDING. I received a notice today that he Permit will expire in 3 days. I am requesting a 90 day extension, because we are almost done with project, and if everything goes right should be done in next 30-45 days, but because of reviews, and inspections from both City of Tucson and TEP ,that always take an indefinite amount of time, i am requesting 90 days just in case. |
| REQ-0923-05166 | Complete | 09/24/2023 | 10/09/2023 | Requests | We need an additional 90 days extension because we have had to make many Elect Plan design changes, or additions and re-submittals for both the City of Tucson and to TEP, due to Project complexities, and the fact that it has been difficult and slow to deal with both City and TEP due to lack of staff and training. For Solar PV Project for the Desert Metal Works INDUSTRIAL BUILDING #1 |
| REQ-0923-05167 | Complete | 09/24/2023 | 10/09/2023 | Requests | We need to request an additional 90 days due to the complexities of this project , and due to the fact That the City of Tucson & TEP have been difficult and slow to deal with and communicate with due to lack of staff, and Training. For this Solar project for LASER BUILDING #4. |
| REQ-0923-05168 | Complete | 09/24/2023 | 10/09/2023 | Requests | We need to request a 90 day extension, due to the many plan changes required because of the complexities of this project, and due to the difficulties in process, communications and slowness dealing with both City of Tucson, & TEP , due to lack of staff and training. For this PV Solar project for OFFICE Bldg. Meter, (Address Bldg. # 2). |
| REQ-0923-05169 | Complete | 09/24/2023 | 10/27/2023 | Requests | We need to request a 90 day extension, due to the timeline and complexities of coordinating Desert Metal Works, Production schedule around the 480v Main Elect panel replacement on that building. We are trying to coordinate the shut down , when production schedule is lighter and less costly to the company, as this will take 2 days. We also have requested a power kill from TEP, but because of their lack of staffing and difficulty in communicating with them, it will make it additionally hard to coordinate a date. to replace Main 480v CT Panel |
| REQ-1223-07161 | Complete | 12/29/2023 | 01/10/2024 | Requests | Continuance of permit T99Cm03203 for finals only permit $30000.00 - (INSPECTIONS for Fire - Lane Signs, Fire - Final, Landscape - Final, Building - Final) |