Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1222-00312
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/23/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: TC-COM-1222-00312 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E1.1 ELECTRICAL COMPOSITE POWER INSTALL PLAN: Missing equipment / information from Bus Ducts. Drawing layer may be turned off. E1.1B ELECTRICAL POWER INSTALL PLAN: One Keynote #9 seems to be pointing at receptacle. Keynote #13 on Lab Bench not called out. E3.1 ELECTRICAL SYSTEMS INSTALL PLAN: Detail should be labeled “Electrical Systems Install Plan” PLUMBING REVIEW COMMENTS: Conditionally Approved Approved Subject to Field Inspections If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 03/31/2023 | Site Zoning | APPROVED | Restamp Required | ||
| 04/06/2023 | Bldg Permits - Post Review Express | REVIEW COMPLETED | |||
| 03/24/2023 | Fire New Construction | REVIEW COMPLETED |