Permit Number: TC-COM-1222-00312
Parcel: 14029050B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1222-00312
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2023 Site Zoning APPROVED
01/25/2023 Site Engineering NOT REQUIRED
01/25/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/24/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TC-COM-1222-00312

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Provide Structural Calculations for Foundation per Section 1601.1 of International Building Code 2018 and ASCE 7- 16. The Enercalc printouts submitted references IBC 2012 and ASCE 7-10. Revise calculations and resubmit.
2. The Structural Calculations submitted shows Ceiling Plan and design for the Ceiling members. No Structural Drawing showing the Ceiling Plan is submitted. Submitted Drawing showing the Ceiling Plan.
3. Drawing S2.1 shows Note 3 saying the studs at 16” oc below ceiling joists. Provide info regarding ceiling joists and check if the structure above is adequate to support the additional loading of the ceiling joists.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Denied
Review limited to the non-structural provisions of the 2018 International Building Code. Structural and MEP reviews by others.
This review assumes the following, Please contact the reviewer if information is otherwise:
1. No hazardous materials storage or use that would necessitate classification as a Group "H" occupancy.
2. The entire building, including areas within the scope of work and the corridors serving that area, is fully sprinkled in accordance with NFPA 13.
3. Areas adjacent to the area of work are within a Group "B" occupancy classification or the building qualifies for the nonseparated occupancy provisions of IBC Section 508.3.
4. The building construction type is not identified in the construction documents. Sheet AD1.1B (keynote 9) shows that column wraps are to be demolished. Please confirm the construction type is such that non-fireproofed structural frame members are acceptable as per Table 601 of the IBC. Otherwise, Construction type IIB is assumed.
Please provide project dollar valuation.
END


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E1.1 ELECTRICAL COMPOSITE POWER INSTALL PLAN: Missing equipment / information from Bus Ducts. Drawing layer may be turned off.
E1.1B ELECTRICAL POWER INSTALL PLAN:
One Keynote #9 seems to be pointing at receptacle.
Keynote #13 on Lab Bench not called out.
E3.1 ELECTRICAL SYSTEMS INSTALL PLAN: Detail should be labeled “Electrical Systems Install Plan”


PLUMBING REVIEW COMMENTS:
Conditionally Approved
Approved Subject to Field Inspections


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
01/11/2023 Fire New Construction REVIEW COMPLETED