Permit Number: TC-COM-1124-02257
Parcel: 140420190

Address:
2731 E ELVIRA RD

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1124-02257
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/10/2024 Commercial Building APPROVED Structural(S) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 12/10/2024 9:24:38 AM


Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 12/10/2024 9:24:05 AM
12/10/2024 Commercial Electrical APPROVED Electrical(E) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 12/10/2024 9:24:14 AM
12/10/2024 Commercial Mechanical APPROVED Mechanical(M) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 12/10/2024 9:24:22 AM
12/10/2024 Commercial Plumbing APPROVED Plumbing(P) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 12/10/2024 9:24:30 AM
12/19/2024 Water - PDSD APPROVED
12/26/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/24/2024 Site Engineering REQUIRES RESUBMIT TC-COM-1124-02257
2731 E ELVIRA RD

Site engineering comments are as follows:
1. The depiction of the loading docks, section detail “A” on the associated development package, TD-DEV-1124-00320, states that it is “Typical,” and no dimension for the width of the loading dock is given on this submission. Please provide a width dimension for the loading dock on the east side of the building.
2. Please provide drawdown calculations for the loading dock sump system. The drawdown time limits are 4 hours if the water is draining off-site, and 12 hours if it is remaining on-site. It is preferred that the dock discharge be routed to landscaped areas or water harvesting basins.
3. Since there is new construction outside of the building footprint, the associated development package, TD-DEV-1124-00320, must be approved by all reviewers prior to the approval of this permit submission. UDC Article 3.3.3.7.a
Ryan Insalaco – ryan.insalaco@tucsonaz.gov
12/26/2024 Site Zoning REQUIRES RESUBMIT FROM: Fernando Garcia - Planner PDSD Zoning Review Section PROJECT: Commercial Addition/Site Improvements TC-COM-1124-02257 (Commercial Storage/General Manufacturing) (I-1) (1st Review) 2731 E Elvira Rd, Tucson, AZ 85756 TRANSMITTAL DATE: 12/26/2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Site Zoning Review Section comments were addressed. 01. COMMENT: See comment from Site Engineering Reviewer Ryan Insalaco. 02. COMMENT: Site Zoning cannot approve the building permit plan set until the development package has been reviewed and approved. Site Zoning will review the building plans on the next submittal and confirm compliance with the approved development package. For questions regarding Site Zoning comments, please contact me at fernando.garcia2@tucsonaz.gov.
12/26/2024 Fire New Construction REVIEW COMPLETED
12/04/2024 PDSD Application Completeness Express REVIEW COMPLETED