Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1124-02168
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/04/2025 | Site Engineering | APPROVED | |||
02/03/2025 | Site Zoning | APPROVED | |||
02/04/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
01/21/2025 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 1/13/2025 3:47:28 PM Building(B) Reviewer (from previous submittal TUC9626001.111324) Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 11/25/2024 4:41:15 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 1/14/2025 1:17:05 PM 1. General - Provide Heat Load Calculations. Show all ventilation Cooling and Heating loads. - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads. i. Heat Loads are not Energy loads. Provide Heat Load Calculations. Include all Ventilation loads in the calculations. only APPROVED calculation programs are acceptable. As per the stated 2018 IECC noted: ▪ Design loads associated with heating, ventilating and air conditioning of the building shall be determined in accordance with ANSI/ASHRAE/ACCA Standard 183 or by an approved (approved by the Authority Having Jurisdiction) equivalent computational procedure using the design parameters specified in Chapter 3. Heating and cooling loads shall be adjusted to account for load reductions that are achieved where energy recovery systems are utilized in the HVAC system in accordance with the ASHRAE HVAC Systems and Equipment Handbook by an approved equivalent computational procedure. - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads. Electrical(E) Reviewer (from previous submittal TUC9626001.111324) Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 11/25/2024 10:30:44 AM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved with Comments Reason: Date Completed : 1/18/2025 9:23:29 AM Second Plumbing Review: OK SUBJECT TO FIELD INSPECTIONS RESOLVED-1). Plan Page A1.2: Missing Gutter & downspout sizing calculations. Add Gutter & downspout sizing calculations.-2018 IPC 1106.3, 1106.6 RESOLVED-2). General: Missing route illustrations and distance to restrooms & High/Low drinking fountain that services this Building. Add the route illustrations and distance to restrooms & High/Low drinking fountain that services this Building.-2018 IPC 403.3.1, 403.3.3, 403.5 RESOLVED-3). General: Plans missing fixture count totals for all correlated spaces. Add fixture count totals for all correlated spaces. -2018 IPC 403.1 RESOLVED-4). Plan Pages M5.3 & M6.1: Lift station Details missing shut off valve & check Valve. Add shut off valve & check Valve to lift station Detail. -2018 IPC 712.2 RESOLVED-5). Mechanical Plans: Missing Acid Neutralizing device detail & location. Add Acid Neutralizing device detail & location. -IPC 2018 803.1, 803.2 **EXISING NEUTRALIZING DEVICE TO REMAIN AS STATED IN RESPONSE COMMENTS-SUBJECT TO FIELD INSPECTIONS** RESOLVED-6). Plan Page M2.3: Hose bib missing Shut off valve. Add Shut off valve on hose bib piping. -2018 IPC 606.2 |
||
01/13/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |