Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1124-02162
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/09/2024 | Water - PDSD | APPROVED | |||
| 12/09/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/26/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 11/26/2024 3:55:47 PM 1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response to all comments may not be reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments. 2. S2.0 - NEW OPENINGS IN EXISTING CONCRETE WALL: The Structural Composite Plan, S2.0, indicates five locations where new openings shall be installed in the existing exterior concrete walls. The structural calculations indicate that new openings shall be a maximum of 8'-0" wide and assume that the existing concrete walls are at least 6" thick, with reinforcement equivalent to #4 horizontal bars @ 12" oc and two #3 vertical bars at 11" oc. Please provide a note on the structural drawings to indicate how these existing conditions shall be confirmed prior to installing new openings and amend the Structural Details 101, 102, 103 or 104 to indicate that openings shall not exceed 8'-0" in width. 3. S2.0 - RAMP SLAB: Per the Structural Composite Plan S2.0, Plan Note 10, the new concrete ramp slab shall be designed by the civil engineer, and therefore is not structural. However, the structural calculations for retaining walls DRW1 thru DRW4 indicate that the walls shall be reinforced against sliding by the adjacent concrete slab. If the slab is being relied upon for the stability of the ramp retaining walls, the structural engineer must provide a minimum concrete thickness and reinforcement. Please provide this information or resubmit the calculations to show the walls are capable of retaining soil without contributions from the slab. 4. STRUCTURAL CALCULATIONS - RETAINING WALLS: The structural general notes indicate that there has been no site-specific geotechnical study conducted for this project. Therefore, the foundation modifications have been designed using the Presumptive Soil Load Bearing values provided in the 2018 IBC Table 1806.2 (1,500 psf for soil types CL, ML, MH or CH). Similarly, for design of retaining walls, in the absence of a geotechnical study, the engineer is required to use the lateral soil loads provide in IBC Table 1610.1. Refer to IBC 1807.1.1 for more information. For soil types CL or ML, the minimum active soil pressure shall be 45 psf or 60 psf, and the maximum passive pressure shall be 100 psf. Please revise the provided structural calculations to confirm the retaining wall designs are sufficient under these revised forces. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 11/25/2024 9:50:38 AM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 11/22/2024 10:10:41 AM 1. General - Provide Existing Unit Schedule. Provide all required information. Confirm Total CFM quantities for Supply Air Drops for each specific existing unit. Match Unit schedule amounts for each specific existing system. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC – Section [A]107.2.1Information on construction documents. 2. Plan Sheet M1.0 - Supply Air branches with Supply grill/diffuser not shown on plans . Show all Supply air branches and Supply grills/diffusers. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC – Section [A]107.2.1Information on construction documents. 3. Plan Sheets M0.0 and M1.0 - Existing unit AC3 shows main supply trunk line labeled as a RA duct. Confirm main supply air duct Tag. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC – Section [A]107.2.1Information on construction documents Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 11/23/2024 5:34:29 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 11/17/2024 1:58:57 PM First Plumbing Review: 1). General: This occupancy type & load requires a High/low drinking fountain & service sink. Add the required plumbing fixtures, illustrations & information to all the affected plan pages. -2018 IPC 403.1 (plumbing page P0.0 show drinking fountain & service sink being demoed the new one do not appear on new building & plumbing floor plan pages) |
||
| 11/29/2024 | Site Engineering | REQUIRES RESUBMIT | TC-COM-1124-02162 2721 E ELVIRA RD Site engineering comments are as follows: 1. The site plan (TD-DEV-1124-00320) must be approved by all reviewers prior to approval of this building permit. UDC Article 3.3.3.7.a 2. Please provide oil filtration on all loading dock sump pumps to prevent pollutant discharge into storm water infrastructure. Ryan Insalaco ryan.insalaco@tucsonaz.gov |
||
| 12/06/2024 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review PROJECT: TC-COM-1124-02162 - TD-DEV-1124-00320 2721 E ELVIRA RD. – I-1 Commercial Storage (1st Review) TRANSMITTAL DATE: December 6, 2024 Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the I-1 zone (UDC 4.7.29). Commercial Storage is an allowed use in the zone (UDC Table 4.8-7), subject to a Use Specific Standards 4.9.10.A and 4.9.13.Q. 1. As Development Package (DP) TD-DEV-1124-00320 has not completed its first review Zoning cannot review the building plans for compliance with the DP and will review on the next submittal. Until the DP is approved by all review agencies Zoning cannot approve this building permit. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 11/26/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 11/12/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |