Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1123-02602
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/17/2023 | Site Zoning | APPROVED | |||
12/05/2023 | Water - PDSD | APPROVED | |||
12/12/2023 | Site Engineering | NOT REQUIRED | |||
12/12/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/17/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/16/2023 2:20:44 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/16/2023 2:19:16 PM 1) General: Specify the unit that is being applied for on the drawing sheets. Include the drawings and scope of work being done for the dryer vent running through the second floor. Please revise all affected sheets. (2018 IBC section 107) 2) General: Include the details for the dryer duct route through the second floor and penetration of the horizontal fire-rated assembly separating the units. (2018 IBC section 1107, 717.6, 2018 IMC section 504.2) 3) Sheet A100: Include the occupancy classification, R-1, R-2, R-3, or R-4. (2018 IBC section 310) 4) Sheet MP1.1: A round 4" duct will not fit in a 2x4 wall without deformation. (2018 IMC section 504.8.2) 5) Sheet MP1.1: Provide the dryer duct length and calculations. (2018 IMC section 504.8.4) 6) Sheet MP2.1: Provide the gas piping details and pipe sizing. (2018 IBC section 107, 2018 IFGC 106.3.1) 6) Sheet E2.0: The electrical panel schedules specify that the panes are rated for 125A, but they are on 150A breakers. Please coordinate the rating of the equipment and over current protection device sizes. (2017 NEC section 408.36) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/16/2023 2:20:07 PM See the building review comments. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/16/2023 2:19:51 PM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/16/2023 2:20:23 PM See the building review comments. |
||
11/22/2023 | Fire New Construction | REVIEW COMPLETED | |||
11/09/2023 | PDSD Application Completeness | REVIEW COMPLETED |