Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel13324006E
JurisdictionTucson
City of Tucson ZoningR-3
Tucson WardWard 2
Tucson Registered NeighborhoodCarriage Park
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 01/15/2025 9:51 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-69-66 Carriage Hill 3301 08/04/1969 3385

Rezoning Cases

Date - 01/15/2025 9:51 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-80-52 Bellevue Corp - Pantano Road R-3 Effectuated 12/23/2010 N MAGUIRE

Special Development Requests & Requirements

Date - 01/15/2025 9:51 a.m.
Total Number Of Special Development Permits - (3)
Activity Number Status Apply Date Expired Date Type Description
H000002390 Closed N/A
T14SA00370 Complete N/A
T22SA00093 Complete N/A Zoning Compliance Letter for Multifamily

Permits

Parcel Number - 13324006E
Date - 01/15/2025 9:51 a.m.
Total Number Of Permits - (230)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-COM-0123-00412 Complete 01/04/2023 03/04/2024 BLDG A UNIT 106 Commercial Building Do necessary renovation to the unit(s) in order for them to have a washer/dryer inside the unit as we advance. However, at this time, we are only requesting permits for units #A106 and # A206
TC-COM-0123-00412 Complete 01/04/2023 03/04/2024 BLDG A UNIT 206 Commercial Building Do necessary renovation to the unit(s) in order for them to have a washer/dryer inside the unit as we advance. However, at this time, we are only requesting permits for units #A106 and # A206
TC-COM-0124-00101 Issued 01/16/2024 04/27/2025 BLDG E UNIT 142 Commercial Building Do necessary renovation to the unit(s) to have a washer/dryer inside the unit. At this time, only requesting permit for unit E142
TC-COM-0124-00192 Issued 01/29/2024 03/22/2025 BLDG E UNIT 242 Commercial Building Do necessary renovation to the unit(s) to have a washer/dryer inside the unit. At this time, only requesting permit for units E242
TC-COM-0223-00661 Withdrawn 02/17/2023 08/16/2023 BLDG E UNIT 143 Commercial Building Wihthdrawn - Do necessary renovation to the unit(s) in order for them to have a washer/dryer inside the unit as we advance. However, at this time, we are only requesting permit for units #E143 and # E243
TC-COM-0223-00661 Withdrawn 02/17/2023 08/16/2023 BLDG E UNIT 243 Commercial Building Wihthdrawn - Do necessary renovation to the unit(s) in order for them to have a washer/dryer inside the unit as we advance. However, at this time, we are only requesting permit for units #E143 and # E243
TC-COM-0323-00788 Complete 02/17/2023 11/20/2023 BLDG E UNIT 243 Commercial Building Do necessary renovation to the unit(s) in order for them to have a washer/dryer inside the unit as we advance. However, at this time, we are only requesting permit for units #E143 and # E243
T22OT00321 Expired 05/04/2022 12/19/2022 Sign - Permanent 1-illum wall sign
T20CM03119 Expired 05/20/2020 N/A BLDGB117 Commercial Building TI: INTERIOR UPGRADE
T20CM03119 Expired 05/20/2020 N/A BLDGB217 Commercial Building TI: INTERIOR UPGRADE
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 101 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 102 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 103 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 104 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 105 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 106 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 107 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 108 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 201 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 202 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 203 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 204 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 205 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 206 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 207 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG A UNIT 208 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 109 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 111 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 112 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 113 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 114 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 115 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 116 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 117 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 118 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 119 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 209 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 211 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 212 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 213 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 214 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 215 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 216 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 217 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 218 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG B UNIT 219 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 120 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 121 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 122 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 123 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 124 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 125 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 126 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 127 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 220 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 221 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 222 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 223 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 224 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 225 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 226 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG C UNIT 227 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 128 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 129 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 130 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 131 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 132 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 133 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 134 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 135 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 136 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 137 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 228 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 229 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 230 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 231 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 232 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 233 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 234 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 235 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 236 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG D UNIT 237 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 138 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 139 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 140 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 141 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 142 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 143 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 238 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 239 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 240 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 241 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 242 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG E UNIT 243 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 144 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 145 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 146 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 147 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 148 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 149 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 150 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 151 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 244 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 245 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 246 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 247 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 248 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 249 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 250 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG F UNIT 251 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 152 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 153 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 154 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 155 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 156 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 157 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 252 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 253 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 254 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 255 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 256 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG G UNIT 257 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 158 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 159 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 160 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 161 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 162 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 163 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 164 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 165 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 258 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 259 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 260 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 261 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 262 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 263 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 264 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG H UNIT 265 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 166 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 167 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 168 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 169 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 170 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 171 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 172 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 173 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 174 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 175 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 266 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 267 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 268 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 269 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 270 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 271 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 272 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 273 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 274 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG I UNIT 275 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 176 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 177 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 178 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 179 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 180 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 181 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 182 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 183 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 184 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 185 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 276 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 277 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 278 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 279 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 280 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 281 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 282 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 283 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 284 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG J UNIT 285 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 186 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 187 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 188 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 189 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 190 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 191 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 192 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 193 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 194 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 195 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 196 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 197 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 286 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 287 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 288 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 289 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 290 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 291 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 292 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 293 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 294 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 295 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 296 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01635 Inspections complete 08/21/2024 03/15/2025 BLDG K UNIT 297 Commercial Building Like for like change out. Replace existing (8) meter stack and tap box with new
TC-COM-0824-01678 Inspections 08/28/2024 04/09/2025 Commercial Building New 200 amp electric service with 2 new EV chargers
TC-COM-1123-02602 Issued 11/06/2023 03/22/2025 BLDG E UNIT 143 Commercial Building Do necessary renovation to the unit(s) to have a washer/dryer inside the unit. At this time, only requesting permit for units E143
TC-COM-1122-00151 Complete 11/21/2022 12/12/2023 Commercial Building REMODEL TO EXISTING CLUB HOUSE
T03EL00260 Expired 02/13/2003 08/12/2003 ELECT ELECTRIC:1 HOUR GEN REPAIR LIGHT FIXTURES
T11EL03080 Withdrwn 11/30/2011 N/A #174 ELECT REPLACE: CIRCUIT BREAKER (COMM)
T11EL03091 Final 11/30/2011 06/02/2012 #174 ELECT replace 100amp main breaker (VH)
T13EL00032 Final 02/12/2013 10/03/2017 #189 ELECT Main breaker replacement (VH)
T14CM00847 L of c 02/12/2014 10/27/2014 #001 COMBO CLUBHOUSE COVERED ENTRY REPLACEMENT
T15CM06534 Final 09/18/2015 03/23/2016 #128 COMBO REPL 100AMP MAIN BREAKER
T17CM05355 Expired 07/13/2017 01/30/2020 BLDG#D COMBO TI; APARTMENTS
T17CM06225 Final 08/11/2017 02/19/2018 BLDG#C COMBO replace 8 pack meter
T17CM06359 Expired 08/17/2017 10/18/2019 BLDG#H COMBO TI: APARTMENTS (LAUNDRY ROOMS)
T17CM06613 Expired 08/29/2017 03/19/2020 BLDG#K COMBO TI: APARTMENTS BLDG#K
T17CM07958 Final 10/23/2017 05/14/2019 BLDG#I COMBO TREE INTO BLDG
T19CM03997 Final 06/05/2019 04/12/2020 BLDG#I COMBO TI: INTERIOR UPGRADE
T21CM05808 Final 07/16/2021 05/14/2022 188/288 COMBO Do necessary renovations to the unit(s) in order for them to have a washer/dryer inside the unit as we advance. However, at this time, we are only requesting permits for units #188 and #288.

Code Enforcement

Parcel Number - 13324006E
Date - 01/15/2025 9:51 a.m.
Total Number Of Code Cases - 7
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO0623-04124 Closed - unfounded 06/20/2023 08/03/2023 Code Enforcement Case ENVI- pool not being maintained, green pool.
T10FR01460 Complete 07/23/2010 N/A FIREINSP Full inspection done 7-21-2010; R-2 / B occupancy; Yvonne Bradley - manager 886-4129; Mike Murray - Maint; Bonney Daum- assistant mngr.
T17DV03614 Complian 08/10/2017 N/A BLDG#C DNR_VIOL STORM DAMAGE DAMGE TO UNDERGROUND FEEDER
T17DV03615 Complian 08/10/2017 N/A BLDG#B DNR_VIOL STORM DAMAGE TO GUARD ON THE STAIRCASE.
T19DV05695 Noverify 07/16/2019 N/A DNR_VIOL TRASH DUMPED BETWEEN APARTMNET COMPLEX AND CHURCH IN DRIVEWAY
T20DV07448 Complian 11/17/2020 N/A DNR_VIOL REFUSE IN EASEMENT
T22DV01610 Noverify 03/03/2022 N/A DNR_VIOL External problems in the complex - Many pott holes throughout the parking lot; pool is chipped and no water and no plaster repair; jacuzzi doesn't work; side of the pool has been blocked for tenants using the laundry room; pool pumps are leaking; Projects on hold for over 2 months.