Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1123-02561
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/09/2023 | Site Zoning | APPROVED | |||
11/30/2023 | Site Engineering | NOT REQUIRED | |||
11/30/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/20/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 11/17/2023 10:27:33 PM Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/15/2023 9:40:10 AM 1) General: Provide the energy code compliance details for the envelope, mechanical. and lighting as applicable. Include the U-Factors of the windows and doors in the schedules. (2018 IECC sections C402, C403, C405) 2) General: Provide the accessibility details of the toilet room fixtures, grab bars, maneuvering clearances, clear floor spaces, accessories, and drinking fountains. (2009 ICC A117.1 Sections 304, 305, 404, 602, 603, 604) 3) General: Include the basement level demo and proposed work drawings. (2018 IBC section 107) 4) General: Provide the means of egress paths and emergency lighting along the path. (2018 IBC section 1008.3) 5) Sheet G-000 (Cover Sheet): Provide the building data - occupancy classification, construction type, occupant load, codes and loads used in the design, building area and scope of work area, if building has sprinklers or fire alarms, etc. (2018 IBC section 107) 6) Sheet A-101a: Include the exterior elevations (both sides) and the door and window schedules. (2018 IBC section 107) Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 11/13/2023 3:00:43 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 11/17/2023 12:58:58 PM Electrical Review of Promontory Clubhouse By: Ron Ross PE Should have provided interior lighting calculations to prove IECC compliance. Approved as all LED lights used in design and appears to comply. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 11/19/2023 2:02:29 PM First Plumbing Review: 1). Need to add hot & cold water piping illustrations to plan page P100 -IPC 106.3.1, 604.1 2). Show water heater location(s) on plan page P100 -IPC 106.3.1, 501.4 3). Need to address Bldg plan review comments 2 & 5 -IPC 404.2, 403.1 |
||
11/22/2023 | Fire New Construction | REQUIRES RESUBMIT | -Provide code analysis with all information. Fire sprinklers, Fire alarm, OL, exiting requirements, etc... -Provide exiting plan. -Provide scope of work. -Indicate which I-codes are being used. If IEBC is being used, indicate which compliance method and level of alteration. john.vincent@tucsonaz.gov 5203495581 |
||
11/06/2023 | PDSD Application Completeness | REVIEW COMPLETED |