Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1123-02561
Parcel: 10503002B

Address:
60 W STONE LP

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1123-02561
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/09/2023 Site Zoning APPROVED
11/30/2023 Site Engineering NOT REQUIRED
11/30/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
11/20/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 11/17/2023 10:27:33 PM




Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 11/15/2023 9:40:10 AM
1) General: Provide the energy code compliance details for the envelope, mechanical. and lighting as applicable. Include the U-Factors of the windows and doors in the schedules. (2018 IECC sections C402, C403, C405)

2) General: Provide the accessibility details of the toilet room fixtures, grab bars, maneuvering clearances, clear floor spaces, accessories, and drinking fountains. (2009 ICC A117.1 Sections 304, 305, 404, 602, 603, 604)

3) General: Include the basement level demo and proposed work drawings. (2018 IBC section 107)

4) General: Provide the means of egress paths and emergency lighting along the path. (2018 IBC section 1008.3)

5) Sheet G-000 (Cover Sheet): Provide the building data - occupancy classification, construction type, occupant load, codes and loads used in the design, building area and scope of work area, if building has sprinklers or fire alarms, etc. (2018 IBC section 107)

6) Sheet A-101a: Include the exterior elevations (both sides) and the door and window schedules. (2018 IBC section 107)



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 11/13/2023 3:00:43 PM



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 11/17/2023 12:58:58 PM
Electrical Review of Promontory Clubhouse
By: Ron Ross PE
Should have provided interior lighting calculations to prove IECC compliance. Approved as all LED lights used in design and appears to comply.




Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 11/19/2023 2:02:29 PM
First Plumbing Review:
1). Need to add hot & cold water piping illustrations to plan page P100 -IPC 106.3.1, 604.1


2). Show water heater location(s) on plan page P100 -IPC 106.3.1, 501.4

3). Need to address Bldg plan review comments 2 & 5 -IPC 404.2, 403.1
11/22/2023 Fire New Construction REQUIRES RESUBMIT -Provide code analysis with all information. Fire sprinklers, Fire alarm, OL, exiting requirements, etc...
-Provide exiting plan.
-Provide scope of work.
-Indicate which I-codes are being used. If IEBC is being used, indicate which compliance method and level of alteration.
john.vincent@tucsonaz.gov
5203495581
11/06/2023 PDSD Application Completeness REVIEW COMPLETED