Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1122-00161
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/09/2022 | Site Engineering | APPROVED | |||
| 12/09/2022 | Site Zoning | APPROVED | |||
| 01/12/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/12/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-1122-00161 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: DENIED 1. Provide a complete schedule of special inspections and required construction observations in accordance with Chapter 17 of the IBC. BUILDING REVIEW COMMENTS: DENIED 1. General: Provide an architectural site plans that clearly indicates the structures relation to property lines and other structures. 2. General: Provide the necessary plumbing fixture calculations in accordance with Chapter 29. 3. General: Provide an architectural roof plan. 4. General: Roof drainage sizing calculations have not been provided. Provide roof drain sizing calculations to the roof plan in accordance with Section IPC 1106.1 & 1106.2. 5. General: GPM discharge amounts have not been provided for the roof/drain overflows. Provide the roof/drain overflows in accordance with Section IPC 1106.2 6. Sheet A1: No egress plans have been provided. Provide a detailed egress plans. 7. Sheet A1: There areas that have not been included in the occupant load calculation. Provide a space by space occupant load calculation in accordance with Section 1004.3 and Table 1004.5. 8. Sheet A1: Provide the location of all required portable fire extinguishers in accordance with Section 907. MECHANICAL REVIEW COMMENTS: DENIED 1. Provide mechanical data for the scope of this project, including but not limited to equipment schedules, basic mechanical notes, details (i.e. section through AHU, exhaust fan through roof, condensing unit at roof, curb support for equipment, etc), and other information pertinent to the work. Prepare mechanical calculations to show that outside air and other ventilation requirements are met and balanced. Include a ventilation schedule to drawings. 2. Please provide a COMcheck that indicates compliance for new mechanical system and scan that data onto one of the mechanical sheets. This provides evidence the mechanical system is in compliance. ELECTRICAL REVIEW COMMENTS DENIED 1. Provide the location of required exit signage and egress illumination in accordance with Section 1008 and 1013. 2. Please provide a prescriptive path or provide COMcheck calculations for the lighting. All mandatory requirements must be identified on the plans for compliance. PLUMBING REVIEW COMMENTS: DENIED 1. The construction plans shall include for each floor level a riser diagram of the plumbing water supply and waste piping. The construction plans shall indicate the direction of flow, all pipe sizes, grade of horizontal piping, loading, and location of fixtures and appliances. Please provide a riser diagram for each plumbing system. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 01/04/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 12/08/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |