Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-1122-00097
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/12/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/12/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | STEEL - please see comments on special inspection certificate review | ||
| 03/12/2025 | Special Inspection Certificate Review (Deferred Submittal) Express | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1122-00097 ADDRESS/PARCEL: (9013 E OLD VAIL RD Unit:BLDG 9 TUCSON, AZ 85747) Submit your revised reports along with a detailed response letter which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Special Inspection Certificate is incomplete. Add additional inspections to match the conditions on TDC online portal. Epoxy anchors, Expansion anchors, Field welding, Special Grading Excavation and Filling, and structural welding. Any test not required must be noted as such and stamped/signed by the PE. 2. The steel testing field report was not included. High strength bolting was submitted. 3. Please correct the project name on the SIC. Per PD drawings already submitted, building 9 is part of phase 3, not phase 2 as marked. 4. Please resubmit. Should you have any questions about these comments, I can be reached at ian.gillaspie@tucsonaz.gov. |
||
| 03/12/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 03/11/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |