Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1122-00097
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/09/2022 | Site Engineering | APPROVED | |||
| 11/28/2022 | Site Zoning | APPROVED | |||
| 12/22/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/16/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-1122-00097 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: DENIED 1. Provide a complete schedule of special inspections and required construction observations in accordance with Chapter 17 of the IBC BUILDING REVIEW COMMENTS: DENIED 1. Sheet A1: The occupant load calculation provided is incorrect. It does not included the reception spaces. Provide a corrected occupant load calculation in accordance with Section 1004. 2. Sheet A1: No egress plan has been provided. Provide a detailed egress plan. 3. Sheet A1: While exit access is permitted to go through intervening spaces in this occupancy, provide clarification on the door hardware of the door type #102. It is not permitted to have the ability to lock in accordance with Section 1016.2 #3. 4. Sheet A2: No roof plan has been provided. Provide a basic roof plan. 5. General: Roof drainage sizing calculations have not been provided. Provide roof drain sizing calculations to the roof plan in accordance with Section IPC 1106.1 & 1106.2 6. General: GPM discharge amounts have not been provided for the roof/drain overflows. Provide the roof/drain overflows in accordance with Section IPC 1106.2 MECHANICAL REVIEW COMMENTS: APPROVED ELECTRICAL REVIEW COMMENTS APPROVED PLUMBING REVIEW COMMENTS: APPROVED If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 12/22/2022 | Fire New Construction | REVIEW COMPLETED | |||
| 11/22/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |