Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-1026-01659
Parcel: 132130720

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-1026-01659
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/08/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/08/2026 Commercial Electrical Express REQUIRES RESUBMIT TC-COM-1026-01659 (1260 E TUCSON MARKETPLACE BL TUCSON, AZ 85713) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC
1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2024 IBC section 107.1, 2023 NEC, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf
2. Electrical Plans: Identify the receptacle location, voltage, phase, amperage, and configuration; provide the branch-circuit wiring method, conductor sizes, grounding, and overcurrent protection. (2023 NEC 110.3(B), 210.19, 210.20, 210.21, 250.110, and 300.3)
3. Panel Schedule and Load Calculations: Identify the serving panel, circuit number, breaker rating, and available capacity. Provide revised load calculations demonstrating that the existing electrical service and panel can accommodate the additional load. (2023 NEC 220.12, 220.40, and 220.83, as applicable)
4. Equipment Specifications: Provide the refrigerator manufacturer's specifications, including voltage, phase, minimum circuit ampacity (MCA), maximum overcurrent protection (MOCP), and connection requirements, as applicable. Verify compatibility with the proposed branch circuit and receptacle. (2023 NEC 110.3(B), 422.10, and 422.11)
5. GFCI Protection: Identify the required ground-fault circuit-interrupter (GFCI) protection, where applicable, based on the receptacle voltage, location, and installation conditions. (2023 NEC 210.8(B) and 210.8(D), as applicable)
6. Provide Fault Current Analysis and show new equipment AIC rating sufficient to withstand the calculated Fault Current. Provide Available Fault Current calculations from TEP transformers to all new equipment, 2023 NEC 110.24.
7. Show new Panel’s and other new equipment with AIC ratings greater than or equal to the Available Fault Currents calculated, 2017 NEC 110.10. 6. Notate the grounding and bonding method, including water line bonding, NEC 250.20(B), 250.24, 250.30(A)(1).
8. Please verify if the refrigerator requires a 30A receptacle or a dedicated 30A circuit based on the manufacturer's listing and installation instructions. A 30A receptacle does not, by itself, establish that a 30A circuit is appropriate. IBC 107.2.1
10/08/2026 PDSD Application Completeness Express REVIEW COMPLETED