Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1026-01639
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/13/2026 | Landfill Standard | NOT REQUIRED | Non-Enclosed structure. Landfill review not required. | ||
| N/A | Commercial Building Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Electrical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Mechanical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| N/A | Outdoor Lighting Standard | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| N/A | Water - PDSD Standard | PENDING ASSIGNMENT | |||
| 10/13/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TC-COM-1026-01639 (1st Review) Project: Carport structure for motorcycle parking Location: 7333 E ROSEWOOD ST Review Date: 10/13/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Reviewer Contact: Marco.contreras@tucsonaz.gov Related cases: Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering. To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files. Site Engineering Review Comments: 1. It is required that the required the motorcycle parking canopy either follow the required height clearance of 15 – feet or be setback one foot or greater from the PAAL. Provide a height call-out showing the clearance or show on the site plan that the 1-foot setback is addressed. Address this by: [UDC §7.4.6.F.1 and §7.4.6.E.2] a. Provide a labeled height call-out on the elevation or section view indicating the finished clearance height from the PAAL surface to the underside of the canopy structure and/or provide a dimensioned setback callout on the site plan clearly measuring the distance from the canopy edge to the PAAL edge. b. Provide plan-view dimensions for all PAALs depicted on the site plan, including width and length, to allow for verification of applicable setbacks and required minimum clearances. c. Provide a dimensioned construction detail — at sufficient scale — illustrating the canopy structure in relation to the adjacent PAAL, demonstrating compliance with the applicable height clearance or setback requirement. |
||
| 10/09/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |