Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1025-01842
Parcel: 113073120

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1025-01842
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/31/2025 Commercial Building Standard APPROVED APPROVED UNDER MASTER SET LOCATED AT: TC-COM-0725-01397
10/14/2025 Commercial Electrical Standard APPROVED
10/14/2025 Water - PDSD Standard NOT REQUIRED NOT REQUIRED ON MASTER PERMIT TC-COM-0725-01397
10/31/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/09/2025 Fire New Construction Standard PENDING ASSIGNMENT REVIEW COMPLETE ON MASTER PERMIT TC-COM-0725-01397
10/09/2025 Outdoor Lighting Standard PENDING ASSIGNMENT APPROVED ON MASTER PERMIT TC-COM-0725-01397
10/09/2025 Site Engineering Standard PENDING ASSIGNMENT NOT REQUIRED ON MASTER PERMIT TC-COM-0725-01397
10/09/2025 Site Zoning Standard PENDING ASSIGNMENT APPROVED ON MASTER PERMIT TC-COM-0725-01397
10/14/2025 Commercial Mechanical Standard REQUIRES RESUBMIT 1651 E Glenn Street, Unit 119
10/14/2025 Commercial Plumbing Standard REQUIRES RESUBMIT 1. Provide a description of the proposed replacement water heater, e.g., manufacturer, model, capacity, and gas input. [Second comment: Comment not addressed.] [Initial comment: The description of work for this activity is to replace a water heater. If it is a like-for-like replacement, submit documents that describe the proposed water heater (e.g., Manufacturer specifications). Reference: Section 107.2.1, IBC 2018.]
2. If the gas inputs for the replacement water heater and furnace are not less than or equal to the gas inputs of the appliances being replaced, provide a schematic diagram of the natural gas distribution piping, including the size, material, and developed lengths of the pipes. Reference: Sections 401.3 and 401.8, IFGC 2018.
10/09/2025 PDSD Application Completeness Express REVIEW COMPLETED