Permit Number: TC-COM-1024-02053
Parcel: 12512080A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1024-02053
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/21/2024 Site Zoning APPROVED
11/13/2024 Water - PDSD APPROVED
11/21/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
11/14/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 11/13/2024 9:19:39 PM
1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response to all comments may not be
reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments.
2. GENERAL - WOOD MATERIAL SPECIFICATIONS: Framing details beginning on Sheet S5.0 show sawn lumber framing for new parapet walls are roof rafters. Please update the structural general notes to provide material
specifications for wood framing, including information on wood species, grade, fasteners and connectors as needed.
3. S1.3 / S2.0 - STRUCTURAL STEEL ANCHORS: The foundation plans beginning on Sheet S2.0 indicate multiple locations where new structural steel columns are being installed. The New Column Schedule on S2.0 does not include
information on base plates or anchors for Column Type "C1", nor does it specify a minimum embedment length for the anchor rods at Column Type "C2". The typical Anchor Bolt Schedule on 12/S1.3 similarly does not indicate a minimum
embedment length and Detail 103 on Sheet S4.0 does not specify a base plate, anchor size or embedment for typical Column "C1". Please indicate where this information has been provided or revise the sheets if information has been
omitted.
4. S3.5 - CONFLICTING INFORMATION: The East - Intermediate Framing Plan, S3.5, shows section cuts for Details 204 "SIM" and 229 at the proposed parapet framing. These details call out conflicting information on the stud wall
framing. Please confirm if 2x6 walls studs shall be placed at 16" oc per Detail 204 or at 24" oc per Detail 229 and revise the sheets to be consistent.
5. S5.1 / S5.2 - SCREEN WALL CONNECTIONS: Screen Wall Elevations 214 and 234 currently do not include welding information for the proposed diagonal struts. Further, Detail 214 calls for a HSS4x4 diagonal strut that appears to
extend to the foundation. The exact geometry could not be confirmed, as this brace is not visible in the Architectural Elevation 5/A2-04. Please provide a new or elongated detail that shows how this "first story" diagonal brace is
attached at the ground level.





Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 11/5/2024 4:46:06 PM






Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 11/13/2024 9:14:43 AM
1. General - Provide minimum Mechanical Design Criteria. No Mechanical plans submitted. If applicable provide Mechanical plans. Show if any all HVAC. - 2018 IECC Section C103.2Information on construction documents. - 2018
IBC – Section [A]107.2.1Information on construction documents.




Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 10/30/2024 10:49:43 AM
Submittal is missing the electrical drawings



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 11/10/2024 4:13:31 PM
First Plumbing Review:
1). General: Missing plumbing plans and details for the roof drain & scupper notes 22.06 & 22.07 on plan pages A1.08 & A6.04. Provide plumbing plans and details that correlate to the roof drain & scupper notes 22.06 & 22.07 on plan pages
A1.08 & A6.04 along with sizing & calculations- 2018 IPC 106.3.1, 1106.1, 1106.2, 1106.5, 1108
11/07/2024 Site Engineering REQUIRES RESUBMIT 1. This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP). Please start a new FUP at our permit application web page:
https://tdc-online.tucsonaz.gov/#/home

Note:
Documentation of a cost estimate will be required. The cost estimate must have a cost breakdown and include the cost of materials and labor.


Chris Arrington
chris.arrrington@tucsonaz.gov
11/15/2024 Fire New Construction REVIEW COMPLETED
10/29/2024 PDSD Application Completeness REVIEW COMPLETED