Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1024-02031
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/18/2024 | External Reviewers - SAFEBuilt | APPROVED | Structural(S) Reviewer (from previous submittal TUC9614001.102524) Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 11/6/2024 6:00:22 PM Building(B) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 12/10/2024 11:32:45 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 12/9/2024 9:12:38 AM 1. (RESOLVED) - Plan Sheet M1.1S - VAV 3-1-21 supply air drop CFM total is 1275 CFM. Plan sheet M5.2 states under EXISTING PAC 3 - VAV BOX SCHEDULE (FIRST FLOOR) VAV 3-1-21 total CFM is 825 CFM. Confirm CFM for VAV 3-1-21. - 2018 IECC Section C103.2Information on construction document - 2018 IBC – Section [A]107.2.1Information on construction documents. i. VAV 3-1-21 supply air drop CFM total is 1050 CFM. Plan sheet M5.2 states under EXISTING PAC 3 - VAV BOX SCHEDULE (FIRST FLOOR) VAV 3-1-21 total CFM is 900 CFM. Confirm CFM for VAV 3-1-21. - 2018 IECC Section C103.2Information on construction document - 2018 IBC – Section [A]107.2.1Information on construction documents. a. 2. (RESOLVED) - Plan sheet M1.2N - VAV 1-2-4 Identify all supply type, of air device. - 2018 IECC Section C103.2Information on construction document - 2018 IBC – Section [A]107.2.1Information on construction documents. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 12/6/2024 11:54:06 AM 3. EP601 PANEL SCHEDULES has undersized 20 amp circuit breakers in panel HOS1 for sub panels HOS2 and H2OS2. Feeders imply that the CBs should be 200 amp. Not Addressed. Correct for 'Issued for Constructiion' All other comments and corrections accepted. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 12/8/2024 11:25:37 PM Second Plumbing Review: Approved RESOLVED-1). Plan Pages P4.1 & P5.1: Vacuum Exhaust & fresh air intake need to maintain 25ft separation. Update illustrations to show Vacuum Exhaust & fresh air intake maintaining 25ft separation. -2018 NFPA99 5.1.3.7.7.2 Resolved-2). Plan Page P7.1: Waste Stack Detail # 4, Waste needs to remain 3" thru roof level. Update Waste Stack Detail # 4, to waste remaining remain 3" thru roof level. -2018 IPC 913.4 **P4 is on floor one , P6 is on floor 2, this is a waste stack vent. This is not a vertical wet vent, both fixtures would need to be on same floor level. Stack will need to remain 3" thru roof level.** RESOLVED-3). Plan Page P3.1S: Missing gas piping illustrations & information for the gas water heaters. Add gas piping illustrations & information for gas water heaters.-2018 IFGC 106.31, 402.3. RESOLVED-4). Plan Pages P4.1 & P7.5: Missing Gas water heater exhaust & combustion Air illustrations & information. Add Gas water heater exhaust & combustion Air illustrations & information. -2018 IFGC 304, 503.1 |
||
12/19/2024 | Site Zoning | APPROVED | |||
12/23/2024 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
12/05/2024 | PDSD Application Completeness | REVIEW COMPLETED |