Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.2
Permit Number - TC-COM-1024-02027
Review Name: COMMERCIAL REVIEW - LIMITED v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/12/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/02/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer (from previous submittal TUC9611001.102224) Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 11/6/2024 1:01:01 PM Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/26/2024 1:44:39 PM 1. Unresolved - Special Inspection Certificate: Include all special inspection categories as specified in the plans and list the specific approved special inspector for each inspection category. (2018 IBC section 1704) Part A was not completed. 2. Resolved - General: The architect’s seal may not be legible on many sheets in the set. Verify that the seals are legible when the pages are printed. (2018 IBC section 107) 3. Unresolved - Sheet G100: The wall insulation and fenestration values listed do not match the R-value and U-Factor specified in the Home Energy Rating Certificate. Please correct and coordinate all affected sheets and details. (2018 IECC section C402) The fenestration U-Factors listed on sheet G100 do not match the Home Energy Rating Certificate. 4. Resolved - Sheets G100, G101: Include the total occupant load. (2018 IBC section 107) 5. Unresolved - Sheet A601: Include the hardware set details and U-Factors in the door schedule. (2018 IBC section 107) The hardware details referenced by the hardware numbers in the door schedules are not included on the sheet. The door U-Factors are not included in the door schedules. 6. Resolved - Sheet A602: Include the U-Factor, SHGC, and safety glazing of the windows in the window schedule. Coordinate entries with the Home Energy Rated Certificate entries. (2018 IBC section 107) 7. Unresolved - Sheets G101, E302, E303, E304: Include the emergency lighting and exit signs along the means of egress travel path. The exit signs in the elevator lobby on levels 2, 3, and 4 do not show the exit sign at the exit stair entrance. (2018 IBC sections 1008.3, 1013.1) The corridor exit signs are located greater than 100ft from the midpoint between the signs. The exit sign on the third floor (sheet G101) near the elevator lobby is located between a door leading to a lounge and the exit stairs. The sign should be directly in front of the exit door for easy identification of the means of egress (as shown on the electrical plans). Coordinate the exit sign details on the electrical plans with the means of egress plans. Mechanical(M) Reviewer (from previous submittal TUC9611001.102224) Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 11/4/2024 12:05:30 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 11/27/2024 5:37:16 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 11/29/2024 6:57:42 AM |
||
12/10/2024 | Site Engineering | REQUIRES RESUBMIT | 1. The associated development package TD-DEV-0724-00202 must be approved before this building permit can be approved. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
12/12/2024 | Site Zoning | REQUIRES RESUBMIT | 1. Zoning cannot approve the building permit until the development package has been approved. Contact Loran Shamis at loran.shamis@tucsonaz.gov for any questions. | ||
12/09/2024 | Design Review | REVIEW COMPLETED | The Design Professional has found the Construction Documents conform to approved applicant submittal for IID Design Review. Building Signage will still need approval through the City of Tucson Sign Review Process. Design review comments uploaded to public files in this permit. |
||
12/05/2024 | Fire New Construction | REVIEW COMPLETED | |||
11/25/2024 | PDSD Application Completeness | REVIEW COMPLETED |