Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1023-02523
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/11/2024 | Site Engineering | APPROVED | Shared Studio Session - Master Permit TC-COM-1023-02482(1131 N 6TH AV TUCSON, AZ 85705)/BLDG 1 Commercial Addition/Alteration Permit AND COVERS IMPROVEMENTS FOR TC-COM-1023-02523 (1131 N 6TH AV TUCSON, AZ 85705) BLDG 2 Commercial New Building Permit | ||
| 12/26/2023 | Site Zoning | NOT REQUIRED | Shared Studio Session - Master Permit TC-COM-1023-02482(1131 N 6TH AV TUCSON, AZ 85705)/BLDG 1 Commercial Addition/Alteration Permit AND COVERS IMPROVEMENTS FOR TC-COM-1023-02523 (1131 N 6TH AV TUCSON, AZ 85705) BLDG 2 Commercial New Building Permit | ||
| 01/11/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | Shared Studio Session - Master Permit TC-COM-1023-02482(1131 N 6TH AV TUCSON, AZ 85705)/BLDG 1 Commercial Addition/Alteration Permit AND COVERS IMPROVEMENTS FOR TC-COM-1023-02523 (1131 N 6TH AV TUCSON, AZ 85705) BLDG 2 Commercial New Building Permit | ||
| 12/20/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/19/2023 12:27:17 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/19/2023 12:25:53 PM 1) Unresolved - General: The electrical panel schedule for building 1 shows circuits for classrooms, bathrooms, and offices that are not included in the other sheets. Clarify and coordinate all rooms in existing building 1 and revise all affected sheets. (2018 IBC section 107) See electrical comment #17 below. 2) Resolved - Sheet G100: The lobby of building1 1 is to be calculated at 1 person per 5 sf for standing space only, 1 per 7 sf for seating only, or 1 per 15 for table and chair seating. If there are classrooms, they are not to be calculated as offices. Please revise all affected sheets and plumbing fixture calculations. (2018 IBC section 1004, Table 1004.5) 3) Resolved - Sheets G100, A100, A400: The toilet facilities do not include the lavatories in the same room. Please revise all sheets. (2018 IBC sections 2902.3, 1109.2.1, 2018 IPC Toilet Facility definition, section 405.3.2) 4) Resolved - Sheets G100, A100, A400: The doors cannot swing into the required water closet clear floor spaces. Please revise all affected sheets. (2009 ICC A117.1 sections 603.2.2, 604.3) 5) Resolved - Sheet S0.1 Provide the list of specific special inspections. (2018 IBC Chapter 17) 6) Resolved - Sheet S3.1 Provide the ramp and guard construction details and dimensions. (2018 IBC sections 1012, 1015, 2009 ICC A117.1 sections 405, 405.8, 405.9) 7) Resolved - Sheet A100 (Floor Plan): The existing garage or covered parking is not shown. (2018 IBC section 107) 8) Resolved - Sheet A103 (Roof Plans): Include the roof drainage details. (2018 IPC sections, 1101.1, 1105, 1106, 1108) 9) Resolved - Sheet A300 (Stair Section): The riser and tread dimensions are not shown. (2018 IBC section 1105) 10) Resolved - Sheet A400 (Accessibility Details): Show the accessible signage details. (2009 ICC A117.1 section 703) 11) Resolved - Sheet A601 (Window and Door Schedules): Include the U-Factors of the windows and doors meeting the energy code requirements. (2018 IECC section C402) 12) Resolved - Sheet P102 (Plumbing Diagrams): Include the plumbing diagrams and calculations for building 1. (2018 IPC section 106.3.1) 13) Resolved - Sheet E2.0 (Electrical Plans): Show kitchen receptacles as GFCI protected. (2017 NEC section 210.8) 14) Resolved - Sheet E2.0 (Electrical Plans): Missing the HVAC service GFCI receptacles. (2017 NEC sections 210.8, 210.63) 15) Resolved - Sheet E4.0 (Electrical Schedule and Diagram): The one-line diagram feeder schedule shows 4 feeder conductors and service conductors are being installed for a single-phase system. Please clarify. (2018 IBC section 107) 16) Unresolved - Sheet E4.0 (Electrical Schedule and Diagram): The one-line diagram shows that the panel for building one is a main lug only panel and does not have the required building disconnect. (2017 NEC sections 225.31, 225.32, 225.33) Panel L1 is still shown as MLO on the one-line diagram. Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/19/2023 12:26:40 PM See the building review comments Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/19/2023 12:26:23 PM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/19/2023 12:27:01 PM See the building review comments. |
||
| 12/27/2023 | Fire New Construction | REVIEW COMPLETED | Shared Studio Session - Master Permit TC-COM-1023-02482(1131 N 6TH AV TUCSON, AZ 85705)/BLDG 1 Commercial Addition/Alteration Permit AND COVERS IMPROVEMENTS FOR TC-COM-1023-02523 (1131 N 6TH AV TUCSON, AZ 85705) BLDG 2 Commercial New Building Permit | ||
| 12/18/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |