Permit: TC-COM-1023-02523
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1131 N 6TH AV BLDG 2
Address NEW:
1131 N 6TH AV BLDG 2
Apply Date:
10/26/2023
Applicant:
Description:
THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE. THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR, PARKING, SITE WALLS AND SIDEWALK .
Permit Reviews
Permit Number - TC-COM-1023-02523
Permit Status: Complete
Permit Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE.
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2024 | COMMERCIAL REVIEW - FULL v.1 | 05/10/2024 | APPROVED |
| 12/18/2023 | COMMERCIAL REVIEW - FULL v.2 | 01/12/2024 | REQUIRES RESUBMIT |
| 07/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/02/2024 | APPROVED |
| 08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | APPROVED |
| 01/17/2024 | COMMERCIAL REVIEW - FULL v.3 | 01/19/2024 | APPROVED |
| 08/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/03/2024 | APPROVED |
| 10/26/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/22/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1023-02523
Permit Status: Complete
Permit Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE.
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
| Date | Description | Comments |
|---|---|---|
| 10/26/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 01/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/14/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 01/19/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 10/26/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/02/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 01/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02523
Permite Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE.
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2024 | COT - HCBU - Preslab | N/A | Not Ready | |
| 03/27/2024 | COT - HCPL - Plumbing Intermediate | N/A | Not Ready | |
| 07/17/2024 | BULD - Electrical Clearance | N/A | Not Ready | |
| 07/23/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Client will no longer require gas service. Gas lines to be abandoned. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02523
Permit Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE.
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2024 | COT - HCPL - Yard Water Line | Passed | ||
| 04/19/2024 | COT - HCPL - Sewer | Passed | Sewer line (4”), plumbing underground in slab: Ok to cover progress areas. | |
| 05/08/2024 | COT - HCBU - Preslab | Passed | Ok to place concrete; ensure area is properly termite treated. | |
| 05/08/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Ok to place concrete in progress areas. | |
| 05/31/2024 | COT - HCBU - Framing | Passed | Ok to complete intermediates. | |
| 06/13/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 06/18/2024 | COT - HCEL - Electrical Above Ceiling | Passed | not ready, passed by mistake | |
| 06/20/2024 | COT - HCPL - Plumbing Intermediate | Passed | Ok to insulate and cover walls. | |
| 06/20/2024 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
| 06/20/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 06/20/2024 | COT - HCEL - Electrical Intermediate | Passed | OK to insulate and cover walls. | |
| 06/21/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 07/18/2024 | BULD - Electrical Clearance | Passed | ||
| 08/01/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 08/01/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 08/01/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 08/09/2024 | COT - HCEL - Electrical Final | Passed | ||
| 08/09/2024 | COT - HCME - Mechanical Final | Passed | ||
| 08/09/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 08/12/2024 | COT - FCON - Alarm - Final | Passed | ||
| 08/12/2024 | COT - FCON - Fire - Final | Passed | ||
| 08/13/2024 | COT - HCBU - Building Final | Passed | Ok to make application for a Certificate of Occupancy | |
| 08/20/2024 | ENGR Engineering Final | Passed |