Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-1023-02487
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/20/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
12/20/2024 | External Reviewers - Stantec | REQUIRES RESUBMIT | December 19, 2024 1st Review Light+Path Architects, LLC Attn: Brian G. Hagedon 475 S. Gollob Road Tucson, Arizona 85710 Re: TEEN CHALLENGE – STAFF ADMINISTRATION (BLDG 3) FOUNDATION AND SUPER STRUCTURE (DEFERRED SUBMITTAL – I-JOISTS) City of Tucson Permit Number: TC-COM-1023-02487 Stantec Project Number: 185215066 Stantec File Number: TUC-24-154 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural and structural designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms B V-B 5,231 74 Yes No Separate Permits: Automatic fire sprinklers. Deferred Submittals: Wood ‘I’ Joists. Special Inspections: Earthwork, concrete, epoxy and expansion anchors, field welding, and masonry. GENERAL COMMENTS 1. The Roof Placement Plan includes stamps that state “Not For Construction”. Plans must be “Final” and “For Construction” to approve. ARCHITECTURAL COMMENTS There are no comments. STRUCTURAL COMMENTS There are no comments. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS There are no comments. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
12/16/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |