Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
10/20/2023
Applicant:
Alicia Simmons
Description:
Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3

Permit Reviews

Permit Number - TC-COM-1023-02487
Permit Status: Complete
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Start Date Submittal Complete Date Status  
01/29/2024 COMMERCIAL REVIEW - FULL v.2 01/29/2024 REQUIRES RESUBMIT Review Details
12/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/02/2025 REQUIRES RESUBMIT Review Details
10/25/2023 COMMERCIAL REVIEW - FULL v.1 01/08/2024 REQUIRES RESUBMIT Review Details
02/21/2024 RESTAMP - COMMERCIAL v.1 02/28/2024 APPROVED Review Details
12/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/22/2024 REQUIRES RESUBMIT Review Details
05/29/2026 SPECIAL INSPECTION REVIEW v.3 06/01/2026 APPROVED Review Details
01/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 02/25/2025 APPROVED Review Details
05/14/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/15/2026 APPROVED Review Details
02/13/2024 COMMERCIAL REVIEW - FULL v.3 02/15/2024 REQUIRES RESUBMIT Review Details
02/16/2024 COMMERCIAL REVIEW - FULL v.4 02/21/2024 APPROVED Review Details
04/30/2026 SPECIAL INSPECTION REVIEW v.1 04/30/2026 REQUIRES RESUBMIT Review Details
05/06/2026 SPECIAL INSPECTION REVIEW v.2 05/08/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-1023-02487
Permit Status: Complete
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Date Description Comments
10/25/2023 Please provide plans which contain the Building Number 3 associated with this permit.
01/05/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
01/05/2024 Post-Installed Anchor Inspection Report is required.
10/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/05/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/06/2026 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
01/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
01/05/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1023-02487
Permite Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
03/09/2026 COT - BULD - SWG Clearance N/A Not Applicable
06/28/2024 COT - HCPL - Sewer N/A Partial Pass
11/13/2024 COT - HCEL - Grounding/Bonding N/A Partial Pass Partial pass. UFER inspection. 11/13/2024
11/20/2024 COT - HCBU - Preslab N/A Partial Pass Administration building approved. Okay for concrete placement in slab. 11/20/2024
12/09/2025 COT - HCEL - Electrical Underground N/A Partial Pass
11/13/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Admin building. Line A/1-7 footings. Reinforcement per plan. Okay for concrete placement. 11/13/2024
03/09/2026 ENGR Engineering Final N/A Partial Pass OK for a level 2TCO
03/09/2026 COT - FCON - Fire - Final N/A Partial Pass TCO level 2

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1023-02487
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Total Completed Inspections - 18
Date Description Inspector Results Comments
08/19/2024 COT - HCPL - Rough Soil Passed
03/10/2025 COT - HCBU - Roof Nailing Passed
09/25/2025 COT - HCPL - Yard Water Line Passed
03/09/2026 COT - HCBU - Masonry Pregrout Passed
03/09/2026 COT - HCBU - Stem Wall/Retaining Wall Passed
04/27/2026 TRSP - ROW - Final/Close-Out Passed All work complete for the right of way and PIA
03/09/2026 COT - HCBU - Building Above Ceiling Passed
03/09/2026 COT - HCBU - Exterior Clips/Sheathing Passed
03/09/2026 COT - HCPL - Sewer Passed
03/09/2026 COT - HCEL - Grounding/Bonding Passed
03/09/2026 COT - HCBU - Preslab Passed
03/09/2026 COT - HCBU - Framing Passed
03/09/2026 COT - HCEL - Electrical Underground Passed
03/09/2026 COT - HCBU - Excavation/Rebar/Zoning Passed
04/22/2026 ENGR Engineering Final Passed
04/24/2026 COT - HCEL - Electrical Final Passed
04/28/2026 COT - FCON - Fire - Final Passed
04/29/2026 COT - HCBU - Building Final Passed