Permit: TC-COM-1023-02487
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2637 N ORACLE RD BLDG 3
Address NEW:
2637 N ORACLE RD BLDG 3
Apply Date:
10/20/2023
Applicant:
Alicia Simmons
Description:
Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Permit Reviews
Permit Number - TC-COM-1023-02487
Permit Status: Complete
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/29/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/29/2024 | REQUIRES RESUBMIT |
| 12/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/02/2025 | REQUIRES RESUBMIT |
| 10/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/08/2024 | REQUIRES RESUBMIT |
| 02/21/2024 | RESTAMP - COMMERCIAL v.1 | 02/28/2024 | APPROVED |
| 12/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/22/2024 | REQUIRES RESUBMIT |
| 05/29/2026 | SPECIAL INSPECTION REVIEW v.3 | 06/01/2026 | APPROVED |
| 01/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 02/25/2025 | APPROVED |
| 05/14/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2026 | APPROVED |
| 02/13/2024 | COMMERCIAL REVIEW - FULL v.3 | 02/15/2024 | REQUIRES RESUBMIT |
| 02/16/2024 | COMMERCIAL REVIEW - FULL v.4 | 02/21/2024 | APPROVED |
| 04/30/2026 | SPECIAL INSPECTION REVIEW v.1 | 04/30/2026 | REQUIRES RESUBMIT |
| 05/06/2026 | SPECIAL INSPECTION REVIEW v.2 | 05/08/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1023-02487
Permit Status: Complete
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
| Date | Description | Comments |
|---|---|---|
| 10/25/2023 | Please provide plans which contain the Building Number 3 associated with this permit. | |
| 01/05/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 01/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/05/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 01/05/2024 | Post-Installed Anchor Inspection Report is required. | |
| 10/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/05/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/06/2026 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 01/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 01/05/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02487
Permite Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/28/2024 | COT - HCPL - Sewer | N/A | Partial Pass | |
| 11/13/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | Partial pass. UFER inspection. 11/13/2024 |
| 11/20/2024 | COT - HCBU - Preslab | N/A | Partial Pass | Administration building approved. Okay for concrete placement in slab. 11/20/2024 |
| 12/09/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | |
| 11/13/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Admin building. Line A/1-7 footings. Reinforcement per plan. Okay for concrete placement. 11/13/2024 |
| 03/09/2026 | ENGR Engineering Final | N/A | Partial Pass | OK for a level 2TCO |
| 03/09/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | TCO level 2 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02487
Permit Description: Structural Foundation and Superstructure Plans for the Administration Bldg. with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review. - BUILDING 3
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2024 | COT - HCPL - Rough Soil | Passed | ||
| 03/10/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 09/25/2025 | COT - HCPL - Yard Water Line | Passed | ||
| 03/09/2026 | COT - HCBU - Masonry Pregrout | Passed | ||
| 03/09/2026 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
| 04/27/2026 | TRSP - ROW - Final/Close-Out | Passed | All work complete for the right of way and PIA | |
| 03/09/2026 | COT - HCBU - Building Above Ceiling | Passed | ||
| 03/09/2026 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 03/09/2026 | COT - HCPL - Sewer | Passed | ||
| 03/09/2026 | COT - HCEL - Grounding/Bonding | Passed | ||
| 03/09/2026 | COT - HCBU - Preslab | Passed | ||
| 03/09/2026 | COT - HCBU - Framing | Passed | ||
| 03/09/2026 | COT - HCEL - Electrical Underground | Passed | ||
| 03/09/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/22/2026 | ENGR Engineering Final | Passed | ||
| 04/24/2026 | COT - HCEL - Electrical Final | Passed | ||
| 04/28/2026 | COT - FCON - Fire - Final | Passed | ||
| 04/29/2026 | COT - HCBU - Building Final | Passed |