Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1023-02441
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/27/2023 | Site Zoning | APPROVED | |||
11/08/2023 | Water - PDSD | APPROVED | |||
11/06/2023 | Site Engineering | NOT REQUIRED | |||
11/08/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/30/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/27/2023 11:43:58 AM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/27/2023 11:41:35 AM 1) Sheet A1.0 (Cover Sheet): Provide a brief description of the type of business use of the space. (2018 IBC section 107) 2) Sheet A1.0 (Cover Sheet): The reception/waiting room and the break room are areas of assembly and are to be calculated at 1 person per 15sf, 7sf, or 1/5sf. Please revise affected details. (2018 IBC Table 1004.5) 3) Sheets A1.0 and 1.1: The area and occupancy calculations on sheet A1.1 do not match the details shown on other sheets. Please coordinate all sheets. (2018 IBC section 107) 4) Sheet A2.0: Include the accessibility details. (2009 ICC A117.1) 5) Sheet E1.0 (Power Plan): Show GFCI protected receptacles in the break room. (2017 NEC 210.8) 6) Sheet E1.0 (Power Plan): Specify tamper-resistant receptacles required by 2017 NEC section 406.12. 7) Sheet E1.0 (Power Plan): Include the one-line diagram (new and existing equipment), panel schedule, load calculations, grounding, etc. (2018 IBC section 107) 8) Sheet E2.0 (Lighting Plan): Show the energy code compliance calculations or COMcheck. Include the lighting specifications. (2018 IECC section C405) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/27/2023 11:43:26 AM See the building review comments. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/27/2023 11:43:11 AM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/27/2023 11:43:42 AM See the building review comments. |
||
11/08/2023 | Fire New Construction | REVIEW COMPLETED | |||
10/19/2023 | PDSD Application Completeness | REVIEW COMPLETED |