Permit Number: TC-COM-1023-02382
Parcel: 11105292B

Review Status: Approved

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-1023-02382
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2024 Bldg Permits - Post Review Express REVIEW COMPLETED
01/04/2024 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 1/3/2024 5:49:34 PM



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Approved
Reason:
Date Completed : 1/3/2024 3:45:16 PM

Plans are approved. Subject to the field inspector's approval.



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 10/24/2023 11:27:44 AM



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 10/27/2023 5:43:25 PM
Electrical Review of Ft Lowell Apartments
By: Ron Ross PE

E1.1 ELECTRICAL PLANS: Could not locate Keynote 5.

E2.1 ENLARGED A1 & A2 ELECTRICAL PLANS: Missing Keynote 4.

E2.2 ENLARGED B1 & B2 ELECTRICAL PLANS: Keynote 3 and 4 misused at counter



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved
Reason:
Date Completed : 12/31/2023 11:07:25 PM

Third Plumbing Review: OK

1). Resolved-Plan Pages A2.3 & Wp2.4 show roof drains, the Plumbing plans need to include the primary & secondary roof drain conductor illustrations. -IPC 106.3.1, 1101.2

2). Resolved-Plumbing plans need to include roof drain conductor sizing calculations -IPC 1106.2

3). Resolved-Plan page P4.0 needs to include the primary & secondary roof drain manufacturer names & Model numbers - IPC 1102.6

4). Resolved-Remove the gas verbiage from plan page P4.0 or provide gas plans -IFGC 106.3.1

5). Resolved-Add note to P4.0 fixture schedule that the owner selected plumbing fixtures will comply with -IPC 402.1

6). Resolved-Provide Civil site utility piping plan page 4 for continuation water, sanitary & storm -IPC 106.3.1

7). Resolved-Fire main on plan pages P1.0 & P3.0 need a backflow device -IPC 608.17.4

8). Resolved-How is the remainder of not be routed to the roof drains being discharged on plan page A2.3? -IPC 1101.2
12/19/2023 PDSD Application Completeness Express REVIEW COMPLETED