Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1023-02375
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/09/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
01/09/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved with Comments Reason: Date Completed : 1/4/2024 11:55:00 AM Clarification of previous Comment #3.3. No changes are required. 1. GENERAL - DEFERRED SUBMITTAL REQUIREMENTS: The structural construction documents indicate that the design of the canopy on the plan-south exterior is being deferred. Please note that IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. The IBC further requires the following procedure be followed when permitting deferred submittals: i. All submittals shall first be reviewed by design professional in responsible charge. ii. Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. iii. They shall then be submitted for review by the building official. iv. No structural elements shall be installed until approved by building official. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 1/3/2024 4:40:22 PM 1) Unresolved - General: Detail the purpose of the robot. If used for production, this space would be a Factory use classification. Specify the use of the IT Cage, Regulated Waste Cage (detail waste items and level of hazard), the RME Cage, and the items stored in the warehouse. Please revise all affected sheets. (2018 IBC sections 107, 306) 2) Resolved - General: Provide the accessible route. The door to the break room does not have the minimum 18" maneuvering clearance distance on the latch side of the door. Please revise all affected sheets. (2009 ICC A117.1 section 404.2.3.5) 3) Resolved - General: Include the compliance details or COMcheck for the lighting and mechanical installations. (2018 IECC sections C403, C405) 4) Resolved - Sheet G0.1: The conference room is an area of assembly (table and chairs). Please revise all affected sheets and calculations. (2018 IBC Table 1004.5) 5) Unresolved - Sheets A1.0, A5.0, and A6.0: Show the energy code compliance for the walls and doors. The wall details only show continuous insulation of the top section of the wall (10 feet from the floor). The COMcheck only includes continuous insulation. Include the U-Factor of the doors showing compliance with the 2018 IECC section C402. The wall details only the top part 10 feet from the floor to the roof deck is being insulated for the newly heated spaces. This is not reflected on the COMcheck. Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 10/24/2023 2:41:19 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 12/29/2023 7:23:37 PM Electrical Review of SSD-SAZ3 By: Ron Ross PE E1.2C POWER PLAN AREA C: Could not locate Keynote 19. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved with Comments Reason: Date Completed : 10/31/2023 9:09:01 PM First Plumbing review: OK, Subject to Field Inspections |
||
12/19/2023 | PDSD Application Completeness | REVIEW COMPLETED |