Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1023-02375
Parcel: 14041124E

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-1023-02375
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
01/09/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved with Comments
Reason:
Date Completed : 1/4/2024 11:55:00 AM
Clarification of previous Comment #3.3. No changes are required.
1. GENERAL - DEFERRED SUBMITTAL REQUIREMENTS: The structural construction documents indicate that the design of the canopy on the plan-south exterior is being deferred. Please note that IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. The IBC further requires the following procedure be
followed when permitting deferred submittals:

i. All submittals shall first be reviewed by design professional in responsible charge.

ii. Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.

iii. They shall then be submitted for review by the building official.

iv. No structural elements shall be installed until approved by building official.



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 1/3/2024 4:40:22 PM
1) Unresolved - General: Detail the purpose of the robot. If used for production, this space would be a Factory use classification. Specify the use of the IT Cage, Regulated Waste Cage (detail waste items and level of hazard), the RME
Cage, and the items stored in the warehouse. Please revise all affected sheets. (2018 IBC sections 107, 306)

2) Resolved - General: Provide the accessible route. The door to the break room does not have the minimum 18" maneuvering clearance distance on the latch side of the door. Please revise all affected sheets. (2009 ICC A117.1 section
404.2.3.5)

3) Resolved - General: Include the compliance details or COMcheck for the lighting and mechanical installations. (2018 IECC sections C403, C405)

4) Resolved - Sheet G0.1: The conference room is an area of assembly (table and chairs). Please revise all affected sheets and calculations. (2018 IBC Table 1004.5)
5) Unresolved - Sheets A1.0, A5.0, and A6.0: Show the energy code compliance for the walls and doors. The wall details only show continuous insulation of the top section of the wall (10 feet from the floor). The COMcheck only includes
continuous insulation. Include the U-Factor of the doors showing compliance with the 2018 IECC section C402. The wall details only the top part 10 feet from the floor to the roof deck is being insulated for the newly heated spaces. This is not reflected on the COMcheck.



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 10/24/2023 2:41:19 PM



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 12/29/2023 7:23:37 PM
Electrical Review of SSD-SAZ3
By: Ron Ross PE
E1.2C POWER PLAN AREA C: Could not locate Keynote 19.



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved with Comments
Reason:
Date Completed : 10/31/2023 9:09:01 PM
First Plumbing review: OK, Subject to Field Inspections
12/19/2023 PDSD Application Completeness REVIEW COMPLETED