Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1023-02375
Parcel: 14041124E

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-1023-02375
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/02/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
04/02/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 3/5/2024 2:49:11 PM



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 4/2/2024 10:18:05 AM

1. Unresolved - General: Include the drawings and specifications for the compactor, and the auger. (2018 IBC section 107) The specification sheets and drawings were not provided.

2. Resolved - Sheet G0.2: Provide the scope of work, description of the items stored and processes taking place in the different areas. Label the uses of all spaces and equipment. (2018 IBC section 107)



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 3/6/2024 4:08:17 PM



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 3/30/2024 5:20:45 PM
1. E1.3A MECHANICAL POWER PLAN AREA A: Need to provide circuit information for equipment receptacles. Outdoor receptacles need to be weather proof GFCI protected as per NEC 210.63. Resolved

2. E1.3B MECHANICAL POWER PLAN AREA B: Need to provide circuit information for equipment receptacles. Outdoor receptacles need to be weather proof GFCI protected as per NEC 210.63. Resolved

3. E1.3C MECHANICAL POWER PLAN AREA C: Need to provide circuit information for equipment receptacles. Outdoor receptacles need to be weather proof GFCI protected as per NEC 210.63. Resolved

4. E1.3D MECHANICAL POWER PLAN AREA D: Need to provide circuit information for equipment receptacles. Outdoor receptacles need to be weather proof GFCI protected as per NEC 210.63. Resolved

5. New comment. On Sheet E4.1, Panelboard HM1 Load Description HP-4 shall be coordinated and resized to match Sheet M4.0 Heat pump Rooftop Unit Schedule's Electrical requirements



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved
Reason:
Date Completed : 3/9/2024 8:45:29 AM
Plumbing Revisions: Ok
03/28/2024 PDSD Application Completeness REVIEW COMPLETED