Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0926-01521
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/06/2026 | Commercial Building Standard | APPROVED | |||
| 10/07/2026 | Site Zoning Standard | APPROVED | |||
| 10/06/2026 | Commercial Mechanical Standard | NOT REQUIRED | No mechanical/plumbing work or modifications proposed | ||
| 10/06/2026 | Commercial Plumbing Standard | NOT REQUIRED | No mechanical/plumbing work or modifications proposed | ||
| 09/25/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 09/18/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 10/06/2026 | Water - PDSD Standard | NOT REQUIRED | |||
| 10/07/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/29/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0926-01521 (211 N 4TH AV Unit:UNIT 323 TUCSON, AZ 85705) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Provide a letter certifying the electrical system, receptacles, lighting fixtures and other outlets in the apartment have been inspected by a qualified/licensed electrical contractor and are safe to be re-energized. (water damage, smoke, silt and heat damage possible.) |
||
| 10/07/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 09/16/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |