Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0926-01421
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/21/2026 | Commercial Electrical Standard | APPROVED | |||
| 09/29/2026 | Commercial Mechanical Standard | APPROVED | |||
| 09/29/2026 | Commercial Plumbing Standard | APPROVED | |||
| 09/28/2026 | Site Zoning Standard | APPROVED | |||
| 09/29/2026 | Water - PDSD Standard | APPROVED | |||
| 09/16/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 09/14/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 09/30/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/29/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov 1. The building appears to be classified as a Risk Category IV structure. Verify the Risk Category and provide the required special inspection for through-penetration firestops, membrane-penetration firestops, and fire-resistant joint systems in accordance with 2024 IBC Section 1705.18. Please provide the City of Tucson Special Inspection Certificate(s) with Parts A and B completed with the next submittal. IBC 107.1 SI form link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf 2. Please amend the plans to show that all through-penetrations and membrane penetrations of fire-resistance-rated assemblies are protected with approved firestopping systems. Provide detail drawings on the plans identifying the specific UL-listed (or equivalent) firestopping systems for pipe, conduit, and duct penetrations through rated walls, floors, and ceilings (e.g., putty pads, firestop sealants, collars, or sleeves, as applicable). Per 2024 IBC Section 714.1 through714.4.3 & 714.5.4 3. For each fire-resistance-rated wall assembly shown on the construction drawings, please provide the corresponding listed assembly detail (cut sheet) on the plans. The detail shall include, at a minimum: The listing designation (e.g., UL, GA, Intertek/WHX, or other approved listing). A drawing or cross-section of the assembly showing the required construction. A list of all required components, including framing, gypsum board, insulation, fasteners, joint treatment, and any other materials required by the tested assembly. The required hourly fire-resistance rating. Any applicable limitations, continuity requirements, and installation requirements necessary to maintain the fire-resistance rating. This information is necessary because many tested fire-resistance-rated assemblies require specific proprietary materials and installation methods that cannot be verified from a generic wall section alone. Substituting materials or omitting required components may invalidate the fire-resistance rating of the assembly. Providing the listed assembly details on the drawings allows the design team, contractor, inspectors, and plan reviewers to verify that each fire-resistance-rated wall is constructed in accordance with its tested and approved assembly. 2024 IBC Sections 703.2, 703.3, and 107.2.1. 4. Sheet G-014: Please update the Accessibility Code reference to indicate the 2017 ICC A117.1 edition Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 09/30/2026 | Fire New Construction Standard | REQUIRES RESUBMIT | -Resolve all building comments. john.vincent@tucsonaz.gov 5203495581 |
||
| 09/08/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |