Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0925-01705
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/03/2025 | Commercial Electrical Standard | APPROVED | |||
| 10/09/2025 | Commercial Mechanical Standard | APPROVED | |||
| 10/09/2025 | Commercial Plumbing Standard | APPROVED | |||
| 10/20/2025 | Site Zoning Standard | APPROVED | |||
| 10/08/2025 | Water - PDSD Standard | APPROVED | |||
| 10/02/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 09/24/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 10/20/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/08/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please submit a separate permit for the IDF rooms located on different floors. The same construction documents can be used for both permits; however, please change the description so each floor is separately identified. For example, BUMCT Tower 3, Floor 3NE, converting and combining a clean supply and office to make a new IDF room on the third floor. IBC 107.2.1 Please provide a section showing the fire barrier wall assemblies continuous from the top of a fire-resistance rated floor/ceiling assembly to the bottom of the floor or roof slab/deck above. IBC 707.5 Please provide a drawing showing the 1-hour fire barrier assembly and clarify method of building analysis used for the basis of approval for the fire barrier. For new 1-hour fire-rated assemblies, provide construction details with basis of approval by one of the following: A. Listing number approved by third-party testing agency (i.e., UL, GA) B. Item number for prescriptive fire-resistive assembly under IBC Table 721.1(2) C. Prescriptive assembly constructed under IBC 722.6. Please amend the plans to provide the methods used to maintain the fire barrier integrity at penetrations of the fire barrier. IBC 707.7 Please include the approval agency listing report number for the fire penetration method(s) such as ICC-ES, UL etc. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 10/06/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 09/19/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |