Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0925-01704
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/24/2025 | Site Engineering Standard | APPROVED | |||
| 10/20/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/08/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Commercial Building Review TC-COM-0925-01704 (1500 E TUCSON MARKETPLACE BL TUCSON, AZ 85713) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). Electrical Review: 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete Building Plans s, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 2. Provide construction Complete Set of Plans in accordance with SECTION 107 of the 2018 IBC and the PDSD Building Plan Requirements, a complete set of fully dimensioned plans demonstrating the full scope of work shall be provided. All plans must be sealed and signed by an Architect or Engineer registered in the State of Arizona. Note. Theterm ‘building plans’ may refer to structural, electrical, plumbing, or any other trade regulated by the associated suite of codes adopted by the City of Tucson3. Electrical demo plans. 4. Provide plans and calculations, to include but not be limited to; dimensioned elevations, construction details, framing and roof framing plans, foundation plans, and other drawings as necessary for the canopy and foundations as well as any other foundations and structures not indicated on the plans. Additional comments may be forthcoming with the receipt of a complete plan set. 5. Structural Requirements: • Foundation Plans Complete foundation plan that incorporates the foundation system as recommended in the soils report. • Structural General Notes Include materials, methods, and special inspection requirements. • Lateral Bracing Design and associated details • Floor & Roof Framing Plans Show all layout, section and detail references. • Structural Details Show typical and specific details. • Deferred Submittals Joist, truss, building frame, etc. • Complete Set of Structural Calculations Calculations must be sealed by the registered design professional Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 10/02/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0925-01704 (1500 E TUCSON MARKETPLACE BL TUCSON, AZ 85713) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). Electrical Review: 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 2. Provide an electrical plan showing any/all electrical work. Plans shall include (as necessary for scope of work), but may not be limited to items below: 3. Electrical demo plans. 4. Provide electrical load calculations, for the Main Service Panel, Per NEC 220.40. 5. Provide a line diagram showing the new equipment being added or modified, NEC 110.2, 2018 IBC 107.1. 6. Show all wiring methods in detail for all new or modified branch circuit conductors and feeders. Conductor type and conduit size/type. Note wet use requirements. NEC arts;300 and 408.4. 7. Provide a panel schedules, showing the circuits that are being modified, added or removed or existing. NEC arts;300 and 408.4. Include panel bus rating and A.I.C. rating. IBC 107.1. 8. Designate the circuit number on the electrical plans, that corresponds to the panel schedule, at the location of each existing, new or modified light fixture, receptacle, and equipment disconnect switch, NEC arts;300 and 408.4. IBC 107.1. 9. Provide Fault Current Analysis and show new equipment AIC rating sufficient to withstand the calculated Fault Current. Provide Available Fault Current calculations from TEP transformers to all new equipment, 2017 NEC 110.24. 10. Show new Panel’s and other new equipment with AIC ratings greater than or equal to the Available Fault Currents calculated, 2017 NEC 110.10. Outdoor Lighting Review: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf 1. If any modifications, alterations, additions to the outdoor lighting are being made, Provide an outdoor site lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your lighting fixture table and use the same number on your site plan. Additional comments may be forthcoming with the receipt of a complete plan set. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 10/20/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: TC-COM-0925-01704 1500 E. Tucson Marketplace Blvd. Tucson, AZ 85713 5 EV chargers in parking lot (1st Review) TRANSMITTAL DATE: 10/20/2025 Comment: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. This site is located in PAD-15 (Bridges PAD). 1. Comment: The plans provided appear to show modifications being made to the parking layout which was previously approved in Development Package (TD-DEV-0424-00140). As such, a revision to TD-DEV-0424-00140 will be required. Site Zoning is unable to approve this permit until the DP revision has been approved by all reviewers. 2. Comment: Additional comments may be forthcoming based on responses to zoning comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 09/19/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |