Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0924-01869
Parcel: 117061910

Address:
11 S 6TH AV

Review Status: Approved

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0924-01869
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
12/26/2024 External Reviewers - SAFEBuilt APPROVED Structural(S) Reviewer (from previous submittal TUC9604001.093024)
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 10/15/2024 10:09:32 PM


Building(B) Reviewer (from previous submittal TUC9604001.112224)
Janet Matz
jmatz@safebuilt.com
Approved with Comments
Reason:
Date Completed : 11/28/2024 1:14:13 AM
Provide a copy of the statement of Special Inspection Services forms that are completed, and signed and sealed by the
project design engineer.



Mechanical(M) Reviewer (from previous submittal TUC9604001.112224)
Julio E. Gonzalez
julio@mtcinspectors.com
Approved
Reason:
Date Completed : 11/25/2024 6:35:20 PM




Electrical(E) Reviewer (from previous submittal TUC9604001.093024)
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 10/2/2024 11:29:19 AM
1. E4.1 has error in Load Summary (277/480V) which should be (120/208V). Correct loads in amps calculated.
2. E4.1 has error in Electrical Single Line Diagram short circuit label above Panel A which is shown as F2 when it should
be F3.
3. E4.2 panel schedule for L2 shows panels C and D added to load, but Sheet E4.1 Single Line shows as Panels A and
B added. Should correct/coordinate for construction set
4. E4.2 panel schedule for K1 shows panels A and B added to load, but Sheet E4.1 Single Line shows as Panels C and
D added. Should correct/coordinate for construction set.


Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved
Reason:
Date Completed : 12/26/2024 7:51:05 PM
12/30/2024 Bldg Permits - Post Review Express REVIEW COMPLETED
12/24/2024 PDSD Application Completeness Express REVIEW COMPLETED